Bungalow extensions for homes in Worcester Park
Worcester Park homeowners can use us for the whole bungalow extension project: survey, design, planning or permitted development checks, building regulations and the build itself.
- Guide price in Worcester ParkFrom £34,000 inc VAT
- PlanningSingle storey often permitted development
- Build time10–18 weeks on site
- Postcode districtsKT3, KT4, SM3

Covering Worcester Park
Across KT3, KT4, SM3, we can visit, measure and advise. We also work in nearby New Malden (2 miles), Morden (2 miles), Surbiton (2 miles), Hook (3 miles).
Ewell, in Surrey, is roughly 2 miles from Worcester Park and also on our list. In London, space is at a premium and gardens are often short, so side returns, wraparounds and carefully planned rear extensions tend to make the most of every metre.
Bungalow extension prices in Worcester Park
For Worcester Park we adjust our national guide rates by ×1.3, the factor we use for London. Figures include VAT; your written quote after the survey replaces them.
Typical rates in Worcester Park: £2,280 to £4,420 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 5 m 15 m² | £34,000 – £41,000 | £39,500 – £52,000 | £50,500 – £66,500 |
| 4 m × 6 m 24 m² | £54,500 – £66,000 | £63,500 – £83,000 | £81,000 – £106,500 |
| L-shape 35 m² | £79,500 – £96,000 | £93,000 – £121,000 | £118,000 – £155,000 |
Want a range for your exact size? The guide-price tool takes about a minute.
Planning rules that apply in Worcester Park
In England a single-storey extension to a bungalow follows the normal permitted development limits (3 m or 4 m, or 6 m and 8 m through prior approval). Adding a first floor always needs planning permission.
Homes in conservation areas, national parks, National Landscapes (formerly AONBs), the Broads and World Heritage Sites have tighter rules, so we always check the property's status and planning history before design starts.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Applications are decided by the local planning authority (your district, borough or unitary council).
When a bungalow extension makes sense
- Homeowners planning for later life
- Families wanting more space on one floor
- Bungalows on larger plots
Bungalow roofs are often hipped, which makes tying in an extension roof a careful job. We draw the roof junction early because it drives both the look and the cost.
How the project works
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.
Design and approvals
We draw the design, agree it with you and handle planning or permitted development checks and building regulations.
Fixed written price
You receive a written, itemised price and programme. Nothing starts until you are happy with it.
Build and sign-off
The build is managed from start to finish, inspected at each stage and signed off on completion.
Bungalow extension questions answered
Will my neighbours in Worcester Park be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Do you cover all of Worcester Park?
Yes. We cover Worcester Park and the surrounding parts of Greater London. Site visits are free and there is no obligation.
How long does a bungalow extension take to build in Worcester Park?
On site, typically 10 to 18 weeks once approvals are in place. Before that, allow 6–14 weeks design and approvals.
Can I extend a bungalow without planning permission?
In England a single-storey rear extension to a bungalow follows the same permitted development limits as a house: 3 m or 4 m, or up to 6 m or 8 m through prior approval. Adding a storey always needs planning permission.
Is it better to extend sideways or upwards?
Sideways and rearwards is usually simpler, cheaper and keeps single-level living. Upwards saves garden but means stairs, more structure and planning permission.
Book a free site visit in Worcester Park
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.