Bungalow extensions in Towcester
If you live in Towcester and want more space without moving, a bungalow extension is one of the most practical ways to get it. We handle the drawings, approvals and the build.
- Guide price in TowcesterFrom £24,500 inc VAT
- PlanningSingle storey often permitted development
- Build time10–18 weeks on site
- Postcode districtsNN12

Working in Towcester
We cover Towcester and the postcode districts NN12. The same team covers Brackley (9 miles), Northampton (10 miles), Daventry (11 miles), Wellingborough (18 miles), all within easy reach.
Just over the Buckinghamshire border, Milton Keynes is about 12 miles away. The East Midlands has plenty of inter-war and post-war semis and detached houses with room to extend, alongside Victorian terraces in the towns.
What we take care of
- Level thresholds and accessible layouts
- Structural survey before any upward extension
- Roof designs that tie into the existing hipped or gable roof
- Single-storey extension options assessed first
- Planning application where needed
Will the council need to approve it?
In England a single-storey extension to a bungalow follows the normal permitted development limits (3 m or 4 m, or 6 m and 8 m through prior approval). Adding a first floor always needs planning permission.
Before any drawing is finalised we check whether the house is listed, in a conservation area or subject to an Article 4 direction.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Applications are decided by the local planning authority (your district, borough or unitary council).
What should I budget for a bungalow extension in Towcester?
Prices below are for Towcester, using the East Midlands factor of ×0.95. They are guide ranges including VAT for the build only, not a quote.
Typical rates in Towcester: £1,660 to £3,230 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 5 m 15 m² | £24,500 – £30,000 | £29,000 – £38,000 | £37,000 – £48,500 |
| 4 m × 6 m 24 m² | £39,500 – £48,000 | £46,500 – £60,500 | £59,000 – £78,000 |
| L-shape 35 m² | £58,000 – £70,000 | £68,000 – £88,500 | £86,000 – £113,500 |
Want a range for your exact size? The guide-price tool takes about a minute.
From first visit to completion
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.
Design and approvals
Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.
Fixed written price
You receive a written, itemised price and programme. Nothing starts until you are happy with it.
Build and sign-off
The build is managed from start to finish, inspected at each stage and signed off on completion.
Your questions about a bungalow extension in Towcester
Do you cover all of Towcester?
Yes. We cover Towcester and the surrounding parts of Northamptonshire. Site visits are free and there is no obligation.
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Towcester, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
Who do I contract with for a bungalow extension in Towcester?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
Can I extend a bungalow without planning permission?
In England a single-storey rear extension to a bungalow follows the same permitted development limits as a house: 3 m or 4 m, or up to 6 m or 8 m through prior approval. Adding a storey always needs planning permission.
Is it better to extend sideways or upwards?
Sideways and rearwards is usually simpler, cheaper and keeps single-level living. Upwards saves garden but means stairs, more structure and planning permission.
Book a free site visit in Towcester
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end