Bungalow extensions across Brackley

We design and build bungalow extensions for houses in Brackley, with a written price once the survey and design are done and one point of contact throughout.

  • Guide price in BrackleyFrom £24,500 inc VAT
  • PlanningSingle storey often permitted development
  • Build time10–18 weeks on site
  • Postcode districtsNN13
Bungalow with a rear extension in matching brick and wide glazed doors

Planning and approvals in Brackley

In England a single-storey extension to a bungalow follows the normal permitted development limits (3 m or 4 m, or 6 m and 8 m through prior approval). Adding a first floor always needs planning permission.

In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Applications are decided by the local planning authority (your district, borough or unitary council).

Working in Brackley

Site visits are available across Brackley (NN13). Neighbouring towns we cover include Towcester (9 miles), Daventry (16 miles), Northampton (19 miles), Wellingborough (27 miles).

Homes across the East Midlands often have usable side land or a driveway beside the house, which opens up side and wraparound options.

When a bungalow extension makes sense

  • Bungalows on larger plots
  • Families wanting more space on one floor
  • Homeowners planning for later life

Bungalow roofs are often hipped, which makes tying in an extension roof a careful job. We draw the roof junction early because it drives both the look and the cost.

Bungalow extension prices in Brackley

Labour and material costs vary across the UK, so for Brackley we use our East Midlands factor (×0.95). The ranges include VAT and exclude design, structural and council fees.

Typical rates in Brackley: £1,660 to £3,230 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
3 m × 5 m
15 m²
£24,500 – £30,000£29,000 – £38,000£37,000 – £48,500
4 m × 6 m
24 m²
£39,500 – £48,000£46,500 – £60,500£59,000 – £78,000
L-shape
35 m²
£58,000 – £70,000£68,000 – £88,500£86,000 – £113,500

Want a range for your exact size? The guide-price tool takes about a minute.

Our process, step by step

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    First, a site visit: we look at the house, garden, access and drains and listen to what you need.

  2. Design and approvals

    Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.

  3. Fixed written price

    You receive a written, itemised price and programme. Nothing starts until you are happy with it.

  4. Build and sign-off

    The build is managed from start to finish, inspected at each stage and signed off on completion.

Bungalow extension questions answered

Can I see a price before committing to anything?

Yes. The guide prices on this page are adjusted for Brackley, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.

How long does a bungalow extension take to build in Brackley?

On site, typically 10 to 18 weeks once approvals are in place. Before that, allow 6–14 weeks design and approvals.

Will my neighbours in Brackley be involved?

If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.

Is it better to extend sideways or upwards?

Sideways and rearwards is usually simpler, cheaper and keeps single-level living. Upwards saves garden but means stairs, more structure and planning permission.

Can I extend a bungalow without planning permission?

In England a single-storey rear extension to a bungalow follows the same permitted development limits as a house: 3 m or 4 m, or up to 6 m or 8 m through prior approval. Adding a storey always needs planning permission.

Book a free site visit in Brackley

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote