New Milton bungalow extensions, designed and built
New Milton homeowners can use us for the whole bungalow extension project: survey, design, planning or permitted development checks, building regulations and the build itself.
- Guide price in New MiltonFrom £29,000 inc VAT
- PlanningSingle storey often permitted development
- Build time10–18 weeks on site
- Postcode districtsBH25

Guide prices for New Milton
Labour and material costs vary across the UK, so for New Milton we use our South East England factor (×1.12). The ranges include VAT and exclude design, structural and council fees.
Typical rates in New Milton: £1,960 to £3,810 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 5 m 15 m² | £29,000 – £35,500 | £34,000 – £45,000 | £43,500 – £57,500 |
| 4 m × 6 m 24 m² | £47,000 – £56,500 | £55,000 – £71,500 | £69,500 – £91,500 |
| L-shape 35 m² | £68,500 – £82,500 | £80,000 – £104,000 | £101,500 – £133,500 |
Want a range for your exact size? The guide-price tool takes about a minute.
Working in New Milton
Site visits are available across New Milton (BH25). Nearby, we also take on projects in Hythe (14 miles), Totton (14 miles), Southampton (15 miles), Eastleigh (20 miles).
For homes towards Dorset, Christchurch is around 5 miles away. In the South East, plenty of houses have already been extended once, which makes checking the remaining permitted development allowance an important early step.
Do I need planning permission in New Milton?
In England a single-storey extension to a bungalow follows the normal permitted development limits (3 m or 4 m, or 6 m and 8 m through prior approval). Adding a first floor always needs planning permission.
The planning position for a specific New Milton address depends on its history and any designations, which is why we check it at the first visit.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Applications are decided by the local planning authority (your district, borough or unitary council).
What is included
- Level thresholds and accessible layouts
- Structural survey before any upward extension
- Roof designs that tie into the existing hipped or gable roof
- Single-storey extension options assessed first
- Planning application where needed
How the project works
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
We visit your New Milton home, measure up, talk through what you want and check the planning position.
Design and approvals
We draw the design, agree it with you and handle planning or permitted development checks and building regulations.
Fixed written price
You receive a written, itemised price and programme. Nothing starts until you are happy with it.
Build and sign-off
The build is managed from start to finish, inspected at each stage and signed off on completion.
Your questions about a bungalow extension in New Milton
Do I need building regulations approval in New Milton?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Who do I contract with for a bungalow extension in New Milton?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
How long does a bungalow extension take to build in New Milton?
On site, typically 10 to 18 weeks once approvals are in place. Before that, allow 6–14 weeks design and approvals.
Can I extend a bungalow without planning permission?
In England a single-storey rear extension to a bungalow follows the same permitted development limits as a house: 3 m or 4 m, or up to 6 m or 8 m through prior approval. Adding a storey always needs planning permission.
Is it better to extend sideways or upwards?
Sideways and rearwards is usually simpler, cheaper and keeps single-level living. Upwards saves garden but means stairs, more structure and planning permission.
Book a free site visit in New Milton
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .