Bedroom extensions across Woking
Planning a bedroom extension in Woking? We survey the house, work out the planning route, draw the design and build it, so you deal with one team from the first visit to the completion certificate.
- Guide price in WokingFrom £29,000 inc VAT
- PlanningUsually a householder application
- Build time14–22 weeks on site
- Postcode districtsGU21, GU22, GU23, GU24, KT14

Bedroom extension prices in Woking
Labour and material costs vary across the UK, so for Woking we use our South East England factor (×1.12). The ranges include VAT and exclude design, structural and council fees.
Typical rates in Woking: £1,790 to £3,580 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| One bedroom 12 m² | £29,000 – £35,500 | £29,000 – £38,000 | £32,000 – £43,500 |
| Bedroom and en-suite 18 m² | £32,000 – £39,500 | £38,000 – £49,500 | £48,000 – £65,000 |
| Two rooms 30 m² | £53,500 – £66,000 | £63,500 – £82,500 | £80,500 – £108,000 |
For a figure based on your own dimensions, use our guide-price tool.
Do I need planning permission in Woking?
In England a two-storey rear extension is permitted development only if it projects no more than 3 m from the original rear wall, sits at least 7 m from the rear boundary, matches the roof pitch and uses obscure, non-opening side windows upstairs. Most two-storey extensions therefore go through a householder planning application, which costs £548 from 1 April 2026 and normally takes about 8 weeks.
The planning position for a specific Woking address depends on its history and any designations, which is why we check it at the first visit.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Applications are decided by the local planning authority (your district, borough or unitary council).
Extensions in and around Woking
Our survey diary covers Woking, including GU21, GU22, GU23, GU24, KT14, KT15. We also work in nearby Weybridge (6 miles), Guildford (6 miles), Egham (8 miles), Walton-on-Thames (8 miles).
For homes towards Hampshire, Farnborough is around 9 miles away. The South East has a broad mix of 1930s semis, post-war estates, newer developments and period cottages, and many houses have enough garden for a generous rear extension.
What is included
- Planning drawings and application
- Heating extended to the new rooms
- Fire safety: escape windows and smoke alarms to building regulations
- Structure, roof, insulation and finish
- Layout options: two-storey, over-garage or ground floor
- En-suite drainage and ventilation design
How the project works
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
First, a site visit: we look at the house, garden, access and drains and listen to what you need.
Design and approvals
Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.
Fixed written price
With the design and specification agreed, you get a fixed written price and a start date.
Build and sign-off
Work is carried out to the agreed programme, inspected by building control and signed off at the end.
Your questions about a bedroom extension in Woking
Do you cover all of Woking?
Yes. We cover Woking and the surrounding parts of Surrey. Site visits are free and there is no obligation.
How long does a bedroom extension take to build in Woking?
On site, typically 14 to 22 weeks once approvals are in place. Before that, allow 8–14 weeks design and approvals.
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Woking, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
Will a new bedroom need planning permission?
Upstairs additions usually do. Ground-floor rooms may fall within permitted development, depending on size and position.
Does an en-suite need a window?
No, but it needs mechanical extraction that meets the building regulations. We design the duct route at the drawing stage.
Book a free site visit in Woking
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end