Woking timber frame extensions, designed and built
Our design and build teams take on timber frame extensions in Woking, from the first measured survey through planning and building control to the finished room.
- Guide price in WokingFrom £23,500 inc VAT
- PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
- Build time8–14 weeks on site
- Postcode districtsGU21, GU22, GU23, GU24, KT14

Covering Woking
We cover Woking and the postcode districts GU21, GU22, GU23, GU24, KT14, KT15. Nearby, we also take on projects in Weybridge (6 miles), Guildford (6 miles), Egham (8 miles), Walton-on-Thames (8 miles).
The South East has a broad mix of 1930s semis, post-war estates, newer developments and period cottages, and many houses have enough garden for a generous rear extension.
Timber frame extension prices in Woking
Labour and material costs vary across the UK, so for Woking we use our South East England factor (×1.12). The ranges include VAT and exclude design, structural and council fees.
Typical rates in Woking: £1,960 to £3,810 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 4 m 12 m² | £23,500 – £28,500 | £27,500 – £36,000 | £34,500 – £46,000 |
| 4 m × 5 m 20 m² | £39,000 – £47,500 | £45,500 – £59,500 | £58,000 – £76,500 |
| 5 m × 6 m 30 m² | £58,500 – £71,000 | £68,500 – £89,500 | £87,000 – £114,500 |
Want a range for your exact size? The guide-price tool takes about a minute.
Is a timber frame extension right for your house?
- Homeowners who want strong energy performance
- Contemporary designs with timber or board cladding
- Sites where weight or speed matters
Moisture is the enemy of any timber building. We design ventilated cladding cavities, breather membranes and a proper damp-proof course height, and keep the frame dry during construction.
Planning rules that apply in Woking
In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.
Homes in conservation areas, national parks, National Landscapes (formerly AONBs), the Broads and World Heritage Sites have tighter rules, so we always check the property's status and planning history before design starts.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Applications are decided by the local planning authority (your district, borough or unitary council).
What happens next
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.
Design and approvals
Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.
Fixed written price
The price is fixed in writing once the design is settled, with a clear programme and payment stages.
Build and sign-off
We build it with one project manager, book the building control inspections and hand over the completion certificate.
Your questions about a timber frame extension in Woking
How long does a timber frame extension take to build in Woking?
On site, typically 8 to 14 weeks once approvals are in place. Before that, allow 4–12 weeks design and approvals.
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Woking, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
Who do I contract with for a timber frame extension in Woking?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
Does a timber frame extension need planning permission?
The same planning rules apply as for any extension. If the cladding looks different from the house, permitted development’s matching-materials condition may mean an application is needed.
Is timber frame cheaper than brick?
It is similar overall. The frame can save time on site, but the cladding choice has a big effect on cost. Our guide range is about £1,960 to £3,810 per m² including VAT.
Book a free site visit in Woking
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.