house-extension.uk

Pembroke Dock bedroom extensions, designed and built

A bedroom extension in Pembroke Dock starts with the right design and the right approval route. We take care of both, then build it with our own project management.

  • Guide price in Pembroke DockFrom £24,000 inc VAT
  • PlanningUsually a planning application
  • Build time14–22 weeks on site
  • Postcode districtsSA72
Bedroom in an extension with a roof window and an en-suite shower room

Planning and approvals in Pembroke Dock

In Wales a rear extension of more than one storey can be permitted development only if the ground floor projects no more than 4 m, the upper floor no more than 3 m, it stays at least 10.5 m from the rear boundary and it is not in a conservation area, national park, National Landscape or World Heritage Site. Anything larger needs a planning application to the council.

The planning position for a specific Pembroke Dock address depends on its history and any designations, which is why we check it at the first visit.

Building over or within 3 m of a public sewer needs the water company's consent before the foundations go in.

Building regulations approval is separate from planning. Wales has its own building regulations and approved documents; the council or a registered building control approver checks the plans, inspects the work and issues a completion certificate.

Applications are decided by the local planning authority (your county or county borough council, or the national park authority).

Covering Pembroke Dock

Our survey diary covers Pembroke Dock, including SA72. Nearby, we also take on projects in Haverfordwest (8 miles), Carmarthen (29 miles), Llanelli (33 miles), Ammanford (41 miles).

Welsh housing ranges from stone terraces in the valleys to render-and-slate houses and modern estates, and the Welsh planning rules differ from England's in several places.

What should I budget for a bedroom extension in Pembroke Dock?

For Pembroke Dock we adjust our national guide rates by ×0.93, the factor we use for Wales. Figures include VAT; your written quote after the survey replaces them.

Typical rates in Pembroke Dock: £1,490 to £2,980 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
One bedroom
12 m²
£24,000 – £29,500£24,000 – £31,500£26,500 – £36,000
Bedroom and en-suite
18 m²
£26,500 – £33,000£31,500 – £41,500£40,000 – £54,000
Two rooms
30 m²
£44,500 – £54,500£53,000 – £68,500£66,500 – £89,500

For a figure based on your own dimensions, use our guide-price tool.

What we take care of

  • En-suite drainage and ventilation design
  • Heating extended to the new rooms
  • Fire safety: escape windows and smoke alarms to building regulations
  • Structure, roof, insulation and finish
  • Layout options: two-storey, over-garage or ground floor
  • Planning drawings and application

What happens next

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    First, a site visit: we look at the house, garden, access and drains and listen to what you need.

  2. Design and approvals

    We draw the design, agree it with you and handle planning or permitted development checks and building regulations.

  3. Fixed written price

    You receive a written, itemised price and programme. Nothing starts until you are happy with it.

  4. Build and sign-off

    Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.

Common questions in Pembroke Dock

How long does a bedroom extension take to build in Pembroke Dock?

On site, typically 14 to 22 weeks once approvals are in place. Before that, allow 8–14 weeks design and approvals.

Do I need building regulations approval in Pembroke Dock?

Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.

Can I see a price before committing to anything?

Yes. The guide prices on this page are adjusted for Pembroke Dock, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.

Will a new bedroom need planning permission?

Upstairs additions usually do. Ground-floor rooms may fall within permitted development, depending on size and position.

Does an en-suite need a window?

No, but it needs mechanical extraction that meets the building regulations. We design the duct route at the drawing stage.

Book a free site visit in Pembroke Dock

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote