Bedroom extensions for homes in Haverfordwest
From the first sketch to final sign-off, we plan and build bedroom extensions in Haverfordwest and the surrounding Dyfed area.
- Guide price in HaverfordwestFrom £24,000 inc VAT
- PlanningUsually a planning application
- Build time14–22 weeks on site
- Postcode districtsSA61

Extensions in and around Haverfordwest
Site visits are available across Haverfordwest (SA61). Nearby, we also take on projects in Pembroke Dock (8 miles), Carmarthen (29 miles), Llanelli (36 miles), Ammanford (42 miles).
Gorseinon, in West Glamorgan, is roughly 41 miles from Haverfordwest and also on our list. In Wales, terraced houses with rear offshoots are common in the towns, while detached houses and bungalows dominate in rural areas.
Included in a typical project
- Fire safety: escape windows and smoke alarms to building regulations
- Structure, roof, insulation and finish
- Layout options: two-storey, over-garage or ground floor
- Planning drawings and application
New bedrooms on an upper floor need an escape window or a protected route to the outside under the building regulations. We design the window sizes and stair route to meet that from the outset.
Guide prices for Haverfordwest
Labour and material costs vary across the UK, so for Haverfordwest we use our Wales factor (×0.93). The ranges include VAT and exclude design, structural and council fees.
Typical rates in Haverfordwest: £1,490 to £2,980 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| One bedroom 12 m² | £24,000 – £29,500 | £24,000 – £31,500 | £26,500 – £36,000 |
| Bedroom and en-suite 18 m² | £26,500 – £33,000 | £31,500 – £41,500 | £40,000 – £54,000 |
| Two rooms 30 m² | £44,500 – £54,500 | £53,000 – £68,500 | £66,500 – £89,500 |
Want a range for your exact size? The guide-price tool takes about a minute.
Do I need planning permission in Haverfordwest?
In Wales a rear extension of more than one storey can be permitted development only if the ground floor projects no more than 4 m, the upper floor no more than 3 m, it stays at least 10.5 m from the rear boundary and it is not in a conservation area, national park, National Landscape or World Heritage Site. Anything larger needs a planning application to the council.
The planning position for a specific Haverfordwest address depends on its history and any designations, which is why we check it at the first visit.
Building over or within 3 m of a public sewer needs the water company's consent before the foundations go in.
Building regulations approval is separate from planning. Wales has its own building regulations and approved documents; the council or a registered building control approver checks the plans, inspects the work and issues a completion certificate.
Applications are decided by the local planning authority (your county or county borough council, or the national park authority).
From first visit to completion
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.
Design and approvals
We draw the design, agree it with you and handle planning or permitted development checks and building regulations.
Fixed written price
With the design and specification agreed, you get a fixed written price and a start date.
Build and sign-off
Work is carried out to the agreed programme, inspected by building control and signed off at the end.
Questions people ask about bedroom extensions
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Haverfordwest, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
Do I need building regulations approval in Haverfordwest?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
How long does a bedroom extension take to build in Haverfordwest?
On site, typically 14 to 22 weeks once approvals are in place. Before that, allow 8–14 weeks design and approvals.
Does an en-suite need a window?
No, but it needs mechanical extraction that meets the building regulations. We design the duct route at the drawing stage.
Can I add a ground-floor bedroom for a relative?
Yes. A ground-floor bedroom with an accessible shower room is a common request. If it will be lived in as a self-contained home, planning treats it differently, so tell us how it will be used.
Book a free site visit in Haverfordwest
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.