house-extension.uk

Bedroom extensions in Brentwood

If you live in Brentwood and want more space without moving, a bedroom extension is one of the most practical ways to get it. We handle the drawings, approvals and the build.

  • Guide price in BrentwoodFrom £27,500 inc VAT
  • PlanningUsually a householder application
  • Build time14–22 weeks on site
  • Postcode districtsCM13, CM14, CM15
Bedroom in an extension with a roof window and an en-suite shower room

Working in Brentwood

Our survey diary covers Brentwood, including CM13, CM14, CM15. Nearby, we also take on projects in Billericay (5 miles), Basildon (7 miles), South Ockendon (8 miles), Stanford-le-Hope (9 miles).

Across the East of England many houses sit on generous plots, and single-storey and wraparound extensions are a natural fit.

What should I budget for a bedroom extension in Brentwood?

These guide figures apply our East of England adjustment (×1.06) to national rates. They include VAT at 20% and cover the build itself; design and council fees are listed separately.

Typical rates in Brentwood: £1,700 to £3,390 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
One bedroom
12 m²
£27,500 – £34,000£27,500 – £36,000£30,500 – £41,000
Bedroom and en-suite
18 m²
£30,500 – £37,500£36,000 – £47,000£45,500 – £61,500
Two rooms
30 m²
£50,500 – £62,500£60,000 – £78,000£76,000 – £102,000

Try the guide-price tool to see a range for your own size and finish.

Do I need planning permission in Brentwood?

In England a two-storey rear extension is permitted development only if it projects no more than 3 m from the original rear wall, sits at least 7 m from the rear boundary, matches the roof pitch and uses obscure, non-opening side windows upstairs. Most two-storey extensions therefore go through a householder planning application, which costs £548 from 1 April 2026 and normally takes about 8 weeks.

Homes in conservation areas, national parks, National Landscapes (formerly AONBs), the Broads and World Heritage Sites have tighter rules, so we always check the property's status and planning history before design starts.

Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Applications are decided by the local planning authority (your district, borough or unitary council).

When a bedroom extension makes sense

  • Growing families
  • Homeowners who want an en-suite master bedroom
  • Multi-generational households

New bedrooms on an upper floor need an escape window or a protected route to the outside under the building regulations. We design the window sizes and stair route to meet that from the outset.

From first visit to completion

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    First, a site visit: we look at the house, garden, access and drains and listen to what you need.

  2. Design and approvals

    Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.

  3. Fixed written price

    With the design and specification agreed, you get a fixed written price and a start date.

  4. Build and sign-off

    We build it with one project manager, book the building control inspections and hand over the completion certificate.

Your questions about a bedroom extension in Brentwood

How long does a bedroom extension take to build in Brentwood?

On site, typically 14 to 22 weeks once approvals are in place. Before that, allow 8–14 weeks design and approvals.

Can I see a price before committing to anything?

Yes. The guide prices on this page are adjusted for Brentwood, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.

Do I need building regulations approval in Brentwood?

Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.

Will a new bedroom need planning permission?

Upstairs additions usually do. Ground-floor rooms may fall within permitted development, depending on size and position.

Can I add a ground-floor bedroom for a relative?

Yes. A ground-floor bedroom with an accessible shower room is a common request. If it will be lived in as a self-contained home, planning treats it differently, so tell us how it will be used.

Book a free site visit in Brentwood

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote