Bedroom extensions in Basildon
Basildon homeowners can use us for the whole bedroom extension project: survey, design, planning or permitted development checks, building regulations and the build itself.
- Guide price in BasildonFrom £27,500 inc VAT
- PlanningUsually a householder application
- Build time14–22 weeks on site
- Postcode districtsSS12, SS13, SS14, SS15, SS16

What should I budget for a bedroom extension in Basildon?
Labour and material costs vary across the UK, so for Basildon we use our East of England factor (×1.06). The ranges include VAT and exclude design, structural and council fees.
Typical rates in Basildon: £1,700 to £3,390 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| One bedroom 12 m² | £27,500 – £34,000 | £27,500 – £36,000 | £30,500 – £41,000 |
| Bedroom and en-suite 18 m² | £30,500 – £37,500 | £36,000 – £47,000 | £45,500 – £61,500 |
| Two rooms 30 m² | £50,500 – £62,500 | £60,000 – £78,000 | £76,000 – £102,000 |
Want a range for your exact size? The guide-price tool takes about a minute.
Who a bedroom extension suits
- Homeowners who want an en-suite master bedroom
- Growing families
- Multi-generational households
New bedrooms on an upper floor need an escape window or a protected route to the outside under the building regulations. We design the window sizes and stair route to meet that from the outset.
Do I need planning permission in Basildon?
In England a two-storey rear extension is permitted development only if it projects no more than 3 m from the original rear wall, sits at least 7 m from the rear boundary, matches the roof pitch and uses obscure, non-opening side windows upstairs. Most two-storey extensions therefore go through a householder planning application, which costs £548 from 1 April 2026 and normally takes about 8 weeks.
In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Applications are decided by the local planning authority (your district, borough or unitary council).
Working in Basildon
Across SS12, SS13, SS14, SS15, SS16, SS17, we can visit, measure and advise. Nearby, we also take on projects in Stanford-le-Hope (3 miles), Wickford (4 miles), Billericay (4 miles), Benfleet (5 miles).
The East of England mixes market-town terraces, inter-war semis and modern estates. Clay soils are common in parts of the region, which can affect foundation design.
What happens next
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.
Design and approvals
Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.
Fixed written price
We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.
Build and sign-off
The build is managed from start to finish, inspected at each stage and signed off on completion.
Common questions in Basildon
How long does a bedroom extension take to build in Basildon?
On site, typically 14 to 22 weeks once approvals are in place. Before that, allow 8–14 weeks design and approvals.
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Basildon, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
Will my neighbours in Basildon be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Can I add a ground-floor bedroom for a relative?
Yes. A ground-floor bedroom with an accessible shower room is a common request. If it will be lived in as a self-contained home, planning treats it differently, so tell us how it will be used.
Does an en-suite need a window?
No, but it needs mechanical extraction that meets the building regulations. We design the duct route at the drawing stage.
Book a free site visit in Basildon
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.