Bedroom extensions for homes in Blackwood
We design and build bedroom extensions for houses in Blackwood, with a written price once the survey and design are done and one point of contact throughout.
- Guide price in BlackwoodFrom £24,000 inc VAT
- PlanningUsually a planning application
- Build time14–22 weeks on site
- Postcode districtsCF82, NP12

What should I budget for a bedroom extension in Blackwood?
For Blackwood we adjust our national guide rates by ×0.93, the factor we use for Wales. Figures include VAT; your written quote after the survey replaces them.
Typical rates in Blackwood: £1,490 to £2,980 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| One bedroom 12 m² | £24,000 – £29,500 | £24,000 – £31,500 | £26,500 – £36,000 |
| Bedroom and en-suite 18 m² | £26,500 – £33,000 | £31,500 – £41,500 | £40,000 – £54,000 |
| Two rooms 30 m² | £44,500 – £54,500 | £53,000 – £68,500 | £66,500 – £89,500 |
For a figure based on your own dimensions, use our guide-price tool.
When a bedroom extension makes sense
- Homeowners who want an en-suite master bedroom
- Multi-generational households
- Growing families
New bedrooms on an upper floor need an escape window or a protected route to the outside under the building regulations. We design the window sizes and stair route to meet that from the outset.
Planning rules that apply in Blackwood
In Wales a rear extension of more than one storey can be permitted development only if the ground floor projects no more than 4 m, the upper floor no more than 3 m, it stays at least 10.5 m from the rear boundary and it is not in a conservation area, national park, National Landscape or World Heritage Site. Anything larger needs a planning application to the council.
In a conservation area, national park, National Landscape or World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
Building regulations approval is separate from planning. Wales has its own building regulations and approved documents; the council or a registered building control approver checks the plans, inspects the work and issues a completion certificate.
Building over or within 3 m of a public sewer needs the water company's consent before the foundations go in.
Applications are decided by the local planning authority (your county or county borough council, or the national park authority).
Covering Blackwood
We cover Blackwood and the postcode districts CF82, NP12. We also work in nearby Gelligaer (2 miles), Risca (6 miles), Caerphilly (6 miles), Pontypridd (7 miles).
Pontypool, in Gwent, is roughly 7 miles from Blackwood and also on our list. Welsh housing ranges from stone terraces in the valleys to render-and-slate houses and modern estates, and the Welsh planning rules differ from England's in several places.
From first visit to completion
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
It starts with a visit to your house to measure, check access and talk through ideas and budget.
Design and approvals
Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.
Fixed written price
We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.
Build and sign-off
Work is carried out to the agreed programme, inspected by building control and signed off at the end.
Bedroom extension questions answered
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Blackwood, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
How long does a bedroom extension take to build in Blackwood?
On site, typically 14 to 22 weeks once approvals are in place. Before that, allow 8–14 weeks design and approvals.
Do you cover all of Blackwood?
Yes. We cover Blackwood and the surrounding parts of Mid Glamorgan. Site visits are free and there is no obligation.
Does an en-suite need a window?
No, but it needs mechanical extraction that meets the building regulations. We design the duct route at the drawing stage.
Will a new bedroom need planning permission?
Upstairs additions usually do. Ground-floor rooms may fall within permitted development, depending on size and position.
Book a free site visit in Blackwood
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.