Bedroom extensions in Annan: design, approvals and build
From the first sketch to final sign-off, we plan and build bedroom extensions in Annan and the surrounding Dumfries and Galloway area.
- Guide price in AnnanFrom £25,000 inc VAT
- PlanningUsually planning permission; building warrant needed
- Build time14–22 weeks on site
- Postcode districtsDG12

Who a bedroom extension suits
- Multi-generational households
- Growing families
- Homeowners who want an en-suite master bedroom
Bedroom extension prices in Annan
For Annan we adjust our national guide rates by ×0.98, the factor we use for Scotland. Figures include VAT; your written quote after the survey replaces them.
Typical rates in Annan: £1,570 to £3,140 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| One bedroom 12 m² | £25,000 – £31,500 | £25,000 – £33,000 | £28,000 – £38,000 |
| Bedroom and en-suite 18 m² | £28,000 – £34,500 | £33,500 – £43,500 | £42,000 – £56,500 |
| Two rooms 30 m² | £47,000 – £57,500 | £55,500 – £72,500 | £70,500 – £94,500 |
Want a range for your exact size? The guide-price tool takes about a minute.
Local to Annan
We cover Annan and the postcode districts DG12. Neighbouring towns we cover include Dumfries (15 miles), Stranraer (71 miles).
Hawick, in Scottish Borders, is roughly 34 miles from Annan and also on our list. Scotland's housing includes sandstone villas, terraces and tenements in the cities and plenty of post-war and modern houses and bungalows elsewhere. A building warrant is needed before work starts.
Do I need planning permission in Annan?
In Scotland, householder permitted development rules (Class 1A for single-storey ground-floor extensions and Class 1B for extensions of more than one storey) allow some smaller extensions without a planning application, within limits on depth, height and distance from the boundary. Conservation areas and listed buildings are more restricted. Separately, almost every extension needs a building warrant from the council before work starts.
The planning position for a specific Annan address depends on its history and any designations, which is why we check it at the first visit.
Building close to a public sewer needs the agreement of Scottish Water, which we check during design.
Applications are decided by your council as planning authority.
From first visit to completion
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
It starts with a visit to your house to measure, check access and talk through ideas and budget.
Design and approvals
We draw the design, agree it with you and handle planning or permitted development checks and building regulations.
Fixed written price
You receive a written, itemised price and programme. Nothing starts until you are happy with it.
Build and sign-off
We build it with one project manager, book the building control inspections and hand over the completion certificate.
Common questions in Annan
Who do I contract with for a bedroom extension in Annan?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Annan, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
Do you cover all of Annan?
Yes. We cover Annan and the surrounding parts of Dumfries and Galloway. Site visits are free and there is no obligation.
Will a new bedroom need planning permission?
Upstairs additions usually do. Ground-floor rooms may fall within permitted development, depending on size and position.
Can I add a ground-floor bedroom for a relative?
Yes. A ground-floor bedroom with an accessible shower room is a common request. If it will be lived in as a self-contained home, planning treats it differently, so tell us how it will be used.
Book a free site visit in Annan
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.