house-extension.uk

Annexe extensions in Pembroke Dock: design, approvals and build

A annexe extension in Pembroke Dock starts with the right design and the right approval route. We take care of both, then build it with our own project management.

  • Guide price in Pembroke DockFrom £51,000 inc VAT
  • PlanningUsually a planning application
  • Build time16–24 weeks on site
  • Postcode districtsSA72
Single-storey annexe extension with its own front door and canopy

Covering Pembroke Dock

Site visits are available across Pembroke Dock (SA72). Nearby, we also take on projects in Haverfordwest (8 miles), Carmarthen (29 miles), Llanelli (33 miles), Ammanford (41 miles).

Just over the West Glamorgan border, Gorseinon is about 38 miles away. In Wales, terraced houses with rear offshoots are common in the towns, while detached houses and bungalows dominate in rural areas.

How much does an annexe extension cost in Pembroke Dock?

Prices below are for Pembroke Dock, using the Wales factor of ×0.93. They are guide ranges including VAT for the build only, not a quote.

Typical rates in Pembroke Dock: £1,860 to £3,530 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
Studio annexe
25 m²
£51,000 – £64,000£55,500 – £70,000£69,500 – £88,500
One-bedroom annexe
35 m²
£65,000 – £81,500£78,000 – £98,000£97,500 – £124,000
Larger annexe
45 m²
£83,500 – £105,000£100,000 – £126,000£125,500 – £159,500

Try the guide-price tool to see a range for your own size and finish.

When an annexe extension makes sense

  • Relatives who need support close by
  • Multi-generational families
  • Homes with a large side or rear garden

Accessibility is cheaper to design in than to retrofit. Level access, a 900 mm door width, a level-access shower and space to turn a wheelchair can all be planned into the footprint for little extra cost.

Do I need planning permission in Pembroke Dock?

In Wales an annexe linked to the house and used by your household is assessed as an extension, but its size usually means a planning application is needed.

Homes in conservation areas, national parks, National Landscapes (AONBs) and World Heritage Sites have tighter rules, so we always check the property's status and planning history before design starts.

The Party Wall etc. Act 1996 applies in Wales as in England: notice must be served before work to a shared wall, building on the boundary, or excavating close to a neighbour's foundations.

Building over or within 3 m of a public sewer needs the water company's consent before the foundations go in.

Applications are decided by the local planning authority (your county or county borough council, or the national park authority).

From first visit to completion

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    We visit your Pembroke Dock home, measure up, talk through what you want and check the planning position.

  2. Design and approvals

    Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.

  3. Fixed written price

    We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.

  4. Build and sign-off

    Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.

Your questions about an annexe extension in Pembroke Dock

Can I see a price before committing to anything?

Yes. The guide prices on this page are adjusted for Pembroke Dock, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.

How long does an annexe extension take to build in Pembroke Dock?

On site, typically 16 to 24 weeks once approvals are in place. Before that, allow 10–16 weeks design and approvals.

Do you cover all of Pembroke Dock?

Yes. We cover Pembroke Dock and the surrounding parts of Dyfed. Site visits are free and there is no obligation.

Does an annexe extension need planning permission?

Usually yes, because of its size and the way it will be used. Councils check that it stays ancillary to the main house, so the application must describe the use clearly.

Will an annexe affect council tax?

It can. Some annexes are assessed separately for council tax, with discounts or exemptions in some cases when occupied by a relative. Check with the Valuation Office Agency (England and Wales), your local assessor (Scotland) or Land & Property Services (Northern Ireland).

Book a free site visit in Pembroke Dock

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote