house-extension.uk

Pembroke Dock timber frame extensions, designed and built

Thinking about a timber frame extension for your Pembroke Dock home? Start with a free site visit: we measure up, check what the council will allow and give you honest guide figures on the day.

  • Guide price in Pembroke DockFrom £19,500 inc VAT
  • PlanningWelsh permitted development rules (rear up to 4 m)
  • Build time8–14 weeks on site
  • Postcode districtsSA72
Timber frame extension under construction with OSB sheathing and roof joists

Local to Pembroke Dock

Our survey diary covers Pembroke Dock, including SA72. The same team covers Haverfordwest (8 miles), Carmarthen (29 miles), Llanelli (33 miles), Ammanford (41 miles), all within easy reach.

Welsh housing ranges from stone terraces in the valleys to render-and-slate houses and modern estates, and the Welsh planning rules differ from England's in several places.

Guide prices for Pembroke Dock

These guide figures apply our Wales adjustment (×0.93) to national rates. They include VAT at 20% and cover the build itself; design and council fees are listed separately.

Typical rates in Pembroke Dock: £1,630 to £3,160 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
3 m × 4 m
12 m²
£19,500 – £23,500£22,500 – £30,000£29,000 – £38,000
4 m × 5 m
20 m²
£32,500 – £39,500£38,000 – £49,500£48,000 – £63,500
5 m × 6 m
30 m²
£48,500 – £59,000£57,000 – £74,000£72,500 – £95,000

For a figure based on your own dimensions, use our guide-price tool.

Planning rules that apply in Pembroke Dock

In Wales a single-storey rear extension can usually project up to 4 m beyond the rear wall without a planning application, if it is no more than 4 m high, keeps eaves to 3 m and overall height to 4 m within 2 m of a boundary, and covers no more than half the land around the original house. Wales has no larger home extension prior approval scheme.

In a conservation area, national park, National Landscape or World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.

Building regulations approval is separate from planning. Wales has its own building regulations and approved documents; the council or a registered building control approver checks the plans, inspects the work and issues a completion certificate.

Applications are decided by the local planning authority (your county or county borough council, or the national park authority).

What we take care of

  • Breathable wall build-up with insulation
  • Frame design and structural calculations
  • Foundations, often lighter than masonry
  • Cladding, render or brick slip finish
  • Fire and acoustic details where needed

What happens next

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    First, a site visit: we look at the house, garden, access and drains and listen to what you need.

  2. Design and approvals

    Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.

  3. Fixed written price

    The price is fixed in writing once the design is settled, with a clear programme and payment stages.

  4. Build and sign-off

    We build it with one project manager, book the building control inspections and hand over the completion certificate.

Timber frame extension questions answered

Who do I contract with for a timber frame extension in Pembroke Dock?

Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.

Do I need building regulations approval in Pembroke Dock?

Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.

How long does a timber frame extension take to build in Pembroke Dock?

On site, typically 8 to 14 weeks once approvals are in place. Before that, allow 4–12 weeks design and approvals.

Is timber frame cheaper than brick?

It is similar overall. The frame can save time on site, but the cladding choice has a big effect on cost. Our guide range is about £1,630 to £3,160 per m² including VAT.

Does a timber frame extension need planning permission?

The same planning rules apply as for any extension. If the cladding looks different from the house, permitted development’s matching-materials condition may mean an application is needed.

Book a free site visit in Pembroke Dock

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote