Annexe extensions for homes in Dundee
Our design and build teams take on annexe extensions in Dundee, from the first measured survey through planning and building control to the finished room.
- Guide price in DundeeFrom £53,500 inc VAT
- PlanningScottish householder rules; building warrant needed
- Build time16–24 weeks on site
- Postcode districtsDD1, DD2, DD3, DD4, DD5

Guide prices for Dundee
Prices below are for Dundee, using the Scotland factor of ×0.98. They are guide ranges including VAT for the build only, not a quote.
Typical rates in Dundee: £1,960 to £3,720 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| Studio annexe 25 m² | £53,500 – £67,500 | £58,500 – £73,500 | £73,500 – £93,500 |
| One-bedroom annexe 35 m² | £68,500 – £86,000 | £82,000 – £103,000 | £102,500 – £130,500 |
| Larger annexe 45 m² | £88,000 – £110,500 | £105,500 – £132,500 | £132,000 – £168,000 |
For a figure based on your own dimensions, use our guide-price tool.
Local to Dundee
We cover Dundee and the postcode districts DD1, DD2, DD3, DD4, DD5. Neighbouring towns we cover include Forfar (13 miles), Arbroath (16 miles), Montrose (28 miles).
St Andrews, in Fife, is roughly 11 miles from Dundee and also on our list. Across Scotland, extensions follow Scottish planning and building standards, including the building warrant process, which we build into the programme from the start.
Do I need planning permission in Dundee?
In Scotland, householder permitted development rules (Class 1A for single-storey ground-floor extensions and Class 1B for extensions of more than one storey) allow some smaller extensions without a planning application, within limits on depth, height and distance from the boundary. Conservation areas and listed buildings are more restricted.
Homes in conservation areas, national scenic areas and listed buildings have tighter rules, so we always check the property's status and planning history before design starts.
In Scotland a building warrant from the council is needed before work starts on almost any extension, and a completion certificate is issued when the work is accepted. Building standards are set in the Scottish technical handbooks.
Applications are decided by your council as planning authority.
Included in a typical project
- Kitchenette, shower room and bedroom finish
- Fire separation and alarms to building regulations
- Separate or shared heating and hot water
- Planning application describing ancillary use
- Design for accessibility: level thresholds, wider doors, walk-in shower
Accessibility is cheaper to design in than to retrofit. Level access, a 900 mm door width, a level-access shower and space to turn a wheelchair can all be planned into the footprint for little extra cost.
From first visit to completion
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
We visit your Dundee home, measure up, talk through what you want and check the planning position.
Design and approvals
We draw the design, agree it with you and handle planning or permitted development checks and building regulations.
Fixed written price
You receive a written, itemised price and programme. Nothing starts until you are happy with it.
Build and sign-off
We build it with one project manager, book the building control inspections and hand over the completion certificate.
Questions people ask about annexe extensions
Will my neighbours in Dundee be involved?
If a planning application is needed, the council notifies neighbours. Where work is close to a shared boundary, we agree access and protection with them in writing.
Do I need building regulations approval in Dundee?
Yes. Almost every extension needs it, whatever the planning route. In Scotland that means a building warrant before work starts.
Do you cover all of Dundee?
Yes. We cover Dundee and the surrounding parts of Angus and Dundee. Site visits are free and there is no obligation.
Does an annexe extension need planning permission?
Usually yes, because of its size and the way it will be used. Councils check that it stays ancillary to the main house, so the application must describe the use clearly.
Can the annexe have its own front door?
Yes, many do, but it should still connect to the main house to stay clearly part of it.
Book a free site visit in Dundee
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.