house-extension.uk

Annexe extensions across Arbroath

Planning an annexe extension in Arbroath? We survey the house, work out the planning route, draw the design and build it, so you deal with one team from the first visit to the completion certificate.

  • Guide price in ArbroathFrom £53,500 inc VAT
  • PlanningScottish householder rules; building warrant needed
  • Build time16–24 weeks on site
  • Postcode districtsDD11
Single-storey annexe extension with its own front door and canopy

Extensions in and around Arbroath

We cover Arbroath and the postcode districts DD11. We also work in nearby Montrose (14 miles), Forfar (14 miles), Dundee (16 miles).

Across Scotland, extensions follow Scottish planning and building standards, including the building warrant process, which we build into the programme from the start.

Is an annexe extension right for your house?

  • Multi-generational families
  • Relatives who need support close by
  • Homes with a large side or rear garden

Accessibility is cheaper to design in than to retrofit. Level access, a 900 mm door width, a level-access shower and space to turn a wheelchair can all be planned into the footprint for little extra cost.

How much does an annexe extension cost in Arbroath?

Labour and material costs vary across the UK, so for Arbroath we use our Scotland factor (×0.98). The ranges include VAT and exclude design, structural and council fees.

Typical rates in Arbroath: £1,960 to £3,720 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
Studio annexe
25 m²
£53,500 – £67,500£58,500 – £73,500£73,500 – £93,500
One-bedroom annexe
35 m²
£68,500 – £86,000£82,000 – £103,000£102,500 – £130,500
Larger annexe
45 m²
£88,000 – £110,500£105,500 – £132,500£132,000 – £168,000

Try the guide-price tool to see a range for your own size and finish.

Planning rules that apply in Arbroath

In Scotland, householder permitted development rules (Class 1A for single-storey ground-floor extensions and Class 1B for extensions of more than one storey) allow some smaller extensions without a planning application, within limits on depth, height and distance from the boundary. Conservation areas and listed buildings are more restricted. Separately, almost every extension needs a building warrant from the council before work starts.

In a conservation area or national scenic area the householder permitted development rights are more limited, listed homes need listed building consent, and if rights have been removed by a condition or direction, any extension needs an application.

Building close to a public sewer needs the agreement of Scottish Water, which we check during design.

Applications are decided by your council as planning authority.

What happens next

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    First, a site visit: we look at the house, garden, access and drains and listen to what you need.

  2. Design and approvals

    Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.

  3. Fixed written price

    We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.

  4. Build and sign-off

    Work is carried out to the agreed programme, inspected by building control and signed off at the end.

Questions people ask about annexe extensions

Do I need building regulations approval in Arbroath?

Yes. Almost every extension needs it, whatever the planning route. In Scotland that means a building warrant before work starts.

Will my neighbours in Arbroath be involved?

If a planning application is needed, the council notifies neighbours. Where work is close to a shared boundary, we agree access and protection with them in writing.

Can I see a price before committing to anything?

Yes. The guide prices on this page are adjusted for Arbroath, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.

Can the annexe have its own front door?

Yes, many do, but it should still connect to the main house to stay clearly part of it.

Does an annexe extension need planning permission?

Usually yes, because of its size and the way it will be used. Councils check that it stays ancillary to the main house, so the application must describe the use clearly.

Book a free site visit in Arbroath

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote