Wraparound extensions for homes in Skegness
If you live in Skegness and want more space without moving, a wraparound extension is one of the most practical ways to get it. We handle the drawings, approvals and the build.
- Guide price in SkegnessFrom £34,000 inc VAT
- PlanningUsually a householder application
- Build time14–20 weeks on site
- Postcode districtsPE25

Local to Skegness
Postcode districts we cover around Skegness include PE25. Neighbouring towns we cover include Boston (19 miles), Spalding (32 miles), Cleethorpes (33 miles), Grimsby (34 miles).
The East Midlands has plenty of inter-war and post-war semis and detached houses with room to extend, alongside Victorian terraces in the towns.
What should I budget for a wraparound extension in Skegness?
Prices below are for Skegness, using the East Midlands factor of ×0.95. They are guide ranges including VAT for the build only, not a quote.
Typical rates in Skegness: £1,900 to £3,520 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| Compact L-shape 18 m² | £34,000 – £41,500 | £39,000 – £50,000 | £49,500 – £63,500 |
| Medium L-shape 25 m² | £47,500 – £57,000 | £54,500 – £69,000 | £68,500 – £88,000 |
| Large L-shape 32 m² | £60,500 – £73,000 | £69,500 – £88,500 | £88,000 – £112,500 |
Want a range for your exact size? The guide-price tool takes about a minute.
What we take care of
- Party wall notice support (England and Wales)
- Full internal finish or kitchen-ready shell
- Roof with glazing along the side return
- Survey, design and 3D layout options
- Householder planning application
- Foundations, drainage and any manhole relocation
Planning and approvals in Skegness
In England a wraparound extension is assessed as both a side and a rear extension, and the combination usually falls outside permitted development, so most need a householder planning application (£548 from 1 April 2026).
The planning position for a specific Skegness address depends on its history and any designations, which is why we check it at the first visit.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Applications are decided by the local planning authority (your district, borough or unitary council).
From first visit to completion
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.
Design and approvals
We produce the drawings and structural design, and manage the approvals so they are in place before work starts.
Fixed written price
You receive a written, itemised price and programme. Nothing starts until you are happy with it.
Build and sign-off
We build it with one project manager, book the building control inspections and hand over the completion certificate.
Questions people ask about wraparound extensions
Will my neighbours in Skegness be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Who do I contract with for a wraparound extension in Skegness?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Skegness, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
Is a wraparound better than a side return alone?
It adds far more space, but costs more and needs planning permission more often. Our comparison guide sets the two side by side.
Do wraparound extensions need planning permission?
Usually, yes. In England the side element counts as a side extension and the rear element as a rear extension, and the combination normally falls outside permitted development. A householder application costs £548 in England from 1 April 2026.
Book a free site visit in Skegness
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.