house-extension.uk

Selby wraparound extensions, designed and built

If you live in Selby and want more space without moving, a wraparound extension is one of the most practical ways to get it. We handle the drawings, approvals and the build.

  • Guide price in SelbyFrom £33,500 inc VAT
  • PlanningUsually a householder application
  • Build time14–20 weeks on site
  • Postcode districtsYO8
L-shaped wraparound extension on a brick terraced house at dusk

Covering Selby

Across YO8, we can visit, measure and advise. We also work in nearby York (12 miles), Harrogate (24 miles), Ripon (33 miles), Northallerton (42 miles).

Just over the East Riding of Yorkshire border, Goole is about 10 miles away. Yorkshire and the Humber combines stone-built terraces in the Pennine towns with brick semis and newer estates elsewhere, so materials and roof details need matching with care.

Is a wraparound extension right for your house?

  • Terraced houses that want the largest ground floor possible
  • Families who want kitchen, dining and living in one space
  • Semi-detached houses with a side passage

The corner is where wraparounds succeed or fail. We usually use a single steel goalpost or a corner post hidden in a pier, and set the glazing so the new room reads as one space rather than two boxes.

Will the council need to approve it?

In England a wraparound extension is assessed as both a side and a rear extension, and the combination usually falls outside permitted development, so most need a householder planning application (£548 from 1 April 2026).

Homes in conservation areas, national parks, National Landscapes (formerly AONBs), the Broads and World Heritage Sites have tighter rules, so we always check the property's status and planning history before design starts.

Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Applications are decided by the local planning authority (your district, borough or unitary council).

How much does a wraparound extension cost in Selby?

Prices below are for Selby, using the Yorkshire and the Humber factor of ×0.94. They are guide ranges including VAT for the build only, not a quote.

Typical rates in Selby: £1,880 to £3,480 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
Compact L-shape
18 m²
£33,500 – £41,000£38,500 – £49,500£49,000 – £63,000
Medium L-shape
25 m²
£47,000 – £56,500£54,000 – £68,500£68,000 – £87,000
Large L-shape
32 m²
£60,000 – £72,500£69,000 – £87,500£87,000 – £111,500

Try the guide-price tool to see a range for your own size and finish.

How the project works

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.

  2. Design and approvals

    We produce the drawings and structural design, and manage the approvals so they are in place before work starts.

  3. Fixed written price

    The price is fixed in writing once the design is settled, with a clear programme and payment stages.

  4. Build and sign-off

    Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.

Questions people ask about wraparound extensions

Who do I contract with for a wraparound extension in Selby?

Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.

Can I see a price before committing to anything?

Yes. The guide prices on this page are adjusted for Selby, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.

How long does a wraparound extension take to build in Selby?

On site, typically 14 to 20 weeks once approvals are in place. Before that, allow 8–16 weeks design and approvals.

Will I need to move a drain?

Often. Side returns frequently contain a manhole or a shared drain. Building near or over a public sewer needs the water company’s consent in England and Wales, which we arrange.

Is a wraparound better than a side return alone?

It adds far more space, but costs more and needs planning permission more often. Our comparison guide sets the two side by side.

Book a free site visit in Selby

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote