Wraparound extensions across Sandown
From the first sketch to final sign-off, we plan and build wraparound extensions in Sandown and the surrounding Isle of Wight area.
- Guide price in SandownFrom £40,000 inc VAT
- PlanningUsually a householder application
- Build time14–20 weeks on site
- Postcode districtsPO36, PO37

Is a wraparound extension right for your house?
- Terraced houses that want the largest ground floor possible
- Semi-detached houses with a side passage
- Families who want kitchen, dining and living in one space
The corner is where wraparounds succeed or fail. We usually use a single steel goalpost or a corner post hidden in a pier, and set the glazing so the new room reads as one space rather than two boxes.
Wraparound extension prices in Sandown
For Sandown we adjust our national guide rates by ×1.12, the factor we use for South East England. Figures include VAT; your written quote after the survey replaces them.
Typical rates in Sandown: £2,240 to £4,140 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| Compact L-shape 18 m² | £40,000 – £48,500 | £46,000 – £58,500 | £58,000 – £75,000 |
| Medium L-shape 25 m² | £56,000 – £67,500 | £64,000 – £81,500 | £81,000 – £104,000 |
| Large L-shape 32 m² | £71,500 – £86,500 | £82,000 – £104,000 | £103,500 – £133,000 |
For a figure based on your own dimensions, use our guide-price tool.
Do I need planning permission in Sandown?
In England a wraparound extension is assessed as both a side and a rear extension, and the combination usually falls outside permitted development, so most need a householder planning application (£548 from 1 April 2026).
Before any drawing is finalised we check whether the house is listed, in a conservation area or subject to an Article 4 direction.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Applications are decided by the local planning authority (your district, borough or unitary council).
Covering Sandown
Our survey diary covers Sandown, including PO36, PO37. We also work in nearby Ryde (5 miles), Newport, Isle of Wight (7 miles), Cowes (10 miles).
The South East has a broad mix of 1930s semis, post-war estates, newer developments and period cottages, and many houses have enough garden for a generous rear extension.
Our process, step by step
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
It starts with a visit to your house to measure, check access and talk through ideas and budget.
Design and approvals
Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.
Fixed written price
With the design and specification agreed, you get a fixed written price and a start date.
Build and sign-off
The build is managed from start to finish, inspected at each stage and signed off on completion.
Wraparound extension questions answered
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Sandown, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
Do you cover all of Sandown?
Yes. We cover Sandown and the surrounding parts of Isle of Wight. Site visits are free and there is no obligation.
Who do I contract with for a wraparound extension in Sandown?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
Do wraparound extensions need planning permission?
Usually, yes. In England the side element counts as a side extension and the rear element as a rear extension, and the combination normally falls outside permitted development. A householder application costs £548 in England from 1 April 2026.
How much does a wraparound extension cost?
Our guide range is about £2,240 to £4,140 per m² including VAT. A 25 m² standard-spec wraparound typically lands around £64,000 to £81,500 in Sandown before design and council fees.
Book a free site visit in Sandown
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.