Portsmouth wraparound extensions, designed and built
Thinking about a wraparound extension for your Portsmouth home? Start with a free site visit: we measure up, check what the council will allow and give you honest guide figures on the day.
- Guide price in PortsmouthFrom £40,000 inc VAT
- PlanningUsually a householder application
- Build time14–20 weeks on site
- Postcode districtsPO1, PO2, PO3, PO4, PO5

Covering Portsmouth
We cover Portsmouth and the postcode districts PO1, PO2, PO3, PO4, PO5, PO12. We also work in nearby Gosport (2 miles), Fareham (5 miles), Havant (6 miles), Waterlooville (6 miles).
Ryde, in Isle of Wight, is roughly 6 miles from Portsmouth and also on our list. The South East has a broad mix of 1930s semis, post-war estates, newer developments and period cottages, and many houses have enough garden for a generous rear extension.
How much does a wraparound extension cost in Portsmouth?
For Portsmouth we adjust our national guide rates by ×1.12, the factor we use for South East England. Figures include VAT; your written quote after the survey replaces them.
Typical rates in Portsmouth: £2,240 to £4,140 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| Compact L-shape 18 m² | £40,000 – £48,500 | £46,000 – £58,500 | £58,000 – £75,000 |
| Medium L-shape 25 m² | £56,000 – £67,500 | £64,000 – £81,500 | £81,000 – £104,000 |
| Large L-shape 32 m² | £71,500 – £86,500 | £82,000 – £104,000 | £103,500 – £133,000 |
Try the guide-price tool to see a range for your own size and finish.
Do I need planning permission in Portsmouth?
In England a wraparound extension is assessed as both a side and a rear extension, and the combination usually falls outside permitted development, so most need a householder planning application (£548 from 1 April 2026).
The planning position for a specific Portsmouth address depends on its history and any designations, which is why we check it at the first visit.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Applications are decided by the local planning authority (your district, borough or unitary council).
Included in a typical project
- Full internal finish or kitchen-ready shell
- Householder planning application
- Roof with glazing along the side return
- Structural design for the corner and openings
How the project works
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.
Design and approvals
Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.
Fixed written price
We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.
Build and sign-off
Work is carried out to the agreed programme, inspected by building control and signed off at the end.
Wraparound extension questions answered
Do I need building regulations approval in Portsmouth?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
How long does a wraparound extension take to build in Portsmouth?
On site, typically 14 to 20 weeks once approvals are in place. Before that, allow 8–16 weeks design and approvals.
Will my neighbours in Portsmouth be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Is a wraparound better than a side return alone?
It adds far more space, but costs more and needs planning permission more often. Our comparison guide sets the two side by side.
Will I need to move a drain?
Often. Side returns frequently contain a manhole or a shared drain. Building near or over a public sewer needs the water company’s consent in England and Wales, which we arrange.
Book a free site visit in Portsmouth
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.