Wraparound extensions for homes in Moray
A wraparound extension in Moray starts with the right design and the right approval route. We take care of both, then build it with our own project management.
- Guide priceFrom £35,000 inc VAT
- PlanningScottish householder rules; building warrant needed
- Towns covered4
- Site visitFree, no obligation

Towns in Moray
Guide prices for Moray
Labour and material costs vary across the UK, so for Moray we use our Scotland factor (×0.98). The ranges include VAT and exclude design, structural and council fees.
Typical rates in Moray: £1,960 to £3,630 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| Compact L-shape 18 m² | £35,000 – £42,500 | £40,500 – £51,500 | £51,000 – £65,500 |
| Medium L-shape 25 m² | £49,000 – £59,000 | £56,000 – £71,500 | £71,000 – £91,000 |
| Large L-shape 32 m² | £62,500 – £75,500 | £72,000 – £91,000 | £90,500 – £116,500 |
Try the guide-price tool to see a range for your own size and finish.
Working in Moray
Towns we cover in Moray include Elgin, Forres, Buckie, Lossiemouth. Across Scotland, extensions follow Scottish planning and building standards, including the building warrant process, which we build into the programme from the start.
What we take care of
- Roof with glazing along the side return
- Structural design for the corner and openings
- Foundations, drainage and any manhole relocation
- Survey, design and 3D layout options
Do I need planning permission in Moray?
In Scotland, householder permitted development rules (Class 1A for single-storey ground-floor extensions and Class 1B for extensions of more than one storey) allow some smaller extensions without a planning application, within limits on depth, height and distance from the boundary. Conservation areas and listed buildings are more restricted.
Before any drawing is finalised we check whether the house is listed, in a conservation area or subject to an Article 4 direction.
Scotland has no Party Wall Act. Where work affects a shared wall or a neighbour's land, we agree access, protection and making good with your neighbour in writing before work starts.
In Scotland a building warrant from the council is needed before work starts on almost any extension, and a completion certificate is issued when the work is accepted. Building standards are set in the Scottish technical handbooks.
Applications are decided by your council as planning authority.
What happens next
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.
Design and approvals
We draw the design, agree it with you and handle planning or permitted development checks and building regulations.
Fixed written price
With the design and specification agreed, you get a fixed written price and a start date.
Build and sign-off
We build it with one project manager, book the building control inspections and hand over the completion certificate.
Common questions in Moray
How long does a wraparound extension take to build in Moray?
On site, typically 14 to 20 weeks once approvals are in place. Before that, allow 8–16 weeks design and approvals.
Do you cover all of Moray?
Yes, across the whole of Moray. Site visits are free and there is no obligation.
Do I need building regulations approval in Moray?
Yes. Almost every extension needs it, whatever the planning route. In Scotland that means a building warrant before work starts.
How much does a wraparound extension cost?
Our guide range is about £1,960 to £3,630 per m² including VAT. A 25 m² standard-spec wraparound typically lands around £56,000 to £71,500 in Moray before design and council fees.
Is a wraparound better than a side return alone?
It adds far more space, but costs more and needs planning permission more often. Our comparison guide sets the two side by side.
Book a free site visit in Moray
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.