Wraparound extensions for homes in Merseyside
We design and build wraparound extensions for houses in Merseyside, with a written price once the survey and design are done and one point of contact throughout.
- Guide priceFrom £34,000 inc VAT
- PlanningUsually a householder application
- Towns covered17
- Site visitFree, no obligation

Towns in Merseyside
Guide prices for Merseyside
Labour and material costs vary across the UK, so for Merseyside we use our North West England factor (×0.95). The ranges include VAT and exclude design, structural and council fees.
Typical rates in Merseyside: £1,900 to £3,520 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| Compact L-shape 18 m² | £34,000 – £41,500 | £39,000 – £50,000 | £49,500 – £63,500 |
| Medium L-shape 25 m² | £47,500 – £57,000 | £54,500 – £69,000 | £68,500 – £88,000 |
| Large L-shape 32 m² | £60,500 – £73,000 | £69,500 – £88,500 | £88,000 – £112,500 |
Try the guide-price tool to see a range for your own size and finish.
Will the council need to approve it?
In England a wraparound extension is assessed as both a side and a rear extension, and the combination usually falls outside permitted development, so most need a householder planning application (£548 from 1 April 2026).
The planning position for a specific Merseyside address depends on its history and any designations, which is why we check it at the first visit.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Applications are decided by the local planning authority (your district, borough or unitary council).
Extensions in and around Merseyside
Towns we cover in Merseyside include Liverpool, Birkenhead, St Helens, Southport, Wallasey, Bootle, Bebington, Huyton. The North West has a high share of Victorian and Edwardian terraces with rear yards and outriggers, plus large areas of inter-war semis in the suburbs.
When a wraparound extension makes sense
- Terraced houses that want the largest ground floor possible
- Semi-detached houses with a side passage
- Families who want kitchen, dining and living in one space
How the project works
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
First, a site visit: we look at the house, garden, access and drains and listen to what you need.
Design and approvals
Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.
Fixed written price
The price is fixed in writing once the design is settled, with a clear programme and payment stages.
Build and sign-off
The build is managed from start to finish, inspected at each stage and signed off on completion.
Questions people ask about wraparound extensions
Do you cover all of Merseyside?
Yes, across the whole of Merseyside. Site visits are free and there is no obligation.
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Merseyside, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
How long does a wraparound extension take to build in Merseyside?
On site, typically 14 to 20 weeks once approvals are in place. Before that, allow 8–16 weeks design and approvals.
Is a wraparound better than a side return alone?
It adds far more space, but costs more and needs planning permission more often. Our comparison guide sets the two side by side.
Will I need to move a drain?
Often. Side returns frequently contain a manhole or a shared drain. Building near or over a public sewer needs the water company’s consent in England and Wales, which we arrange.
Book a free site visit in Merseyside
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.