Larne wraparound extensions, designed and built
Thinking about a wraparound extension for your Larne home? Start with a free site visit: we measure up, check what the council will allow and give you honest guide figures on the day.
- Guide price in LarneFrom £30,500 inc VAT
- PlanningUsually needs planning permission
- Build time14–20 weeks on site
- Postcode districtsBT40

Guide prices for Larne
Labour and material costs vary across the UK, so for Larne we use our Northern Ireland factor (×0.86). The ranges include VAT and exclude design, structural and council fees.
Typical rates in Larne: £1,720 to £3,180 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| Compact L-shape 18 m² | £30,500 – £37,500 | £35,500 – £45,000 | £44,500 – £57,500 |
| Medium L-shape 25 m² | £43,000 – £52,000 | £49,000 – £62,500 | £62,000 – £80,000 |
| Large L-shape 32 m² | £55,000 – £66,500 | £63,000 – £80,000 | £79,500 – £102,000 |
Want a range for your exact size? The guide-price tool takes about a minute.
Local to Larne
Postcode districts we cover around Larne include BT40. Nearby, we also take on projects in Carrickfergus (9 miles), Newtownabbey (14 miles), Belfast (18 miles), Antrim (18 miles).
Bangor, County Down, in County Down, is roughly 14 miles from Larne and also on our list. In Northern Ireland, extension projects follow the NI planning rules and council building control, which we account for from the first survey.
Do I need planning permission in Larne?
In Northern Ireland the Planning (General Permitted Development) Order 2015 lets some single-storey rear extensions go ahead without planning permission, up to 3 m on a semi-detached or terraced house and 4 m on a detached house, within height and boundary limits. Larger, side and two-storey extensions normally need planning permission from the council, and building control approval is separate.
In a conservation area or area of townscape character the permitted development rights are more limited, listed homes need listed building consent, and if rights have been removed by a condition, any extension needs an application.
In Northern Ireland building control is run by the councils under the Building Regulations (Northern Ireland). We submit full plans or a building notice and book the inspections through to completion.
Building close to a public sewer needs the agreement of NI Water, which we check during design.
Applications are decided by your council, which handles local planning in Northern Ireland.
Who a wraparound extension suits
- Families who want kitchen, dining and living in one space
- Semi-detached houses with a side passage
- Terraced houses that want the largest ground floor possible
What happens next
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
First, a site visit: we look at the house, garden, access and drains and listen to what you need.
Design and approvals
Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.
Fixed written price
The price is fixed in writing once the design is settled, with a clear programme and payment stages.
Build and sign-off
Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.
Your questions about a wraparound extension in Larne
Who do I contract with for a wraparound extension in Larne?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
How long does a wraparound extension take to build in Larne?
On site, typically 14 to 20 weeks once approvals are in place. Before that, allow 8–16 weeks design and approvals.
Will my neighbours in Larne be involved?
If a planning application is needed, the council notifies neighbours. Where work is close to a shared boundary, we agree access and protection with them in writing.
How much does a wraparound extension cost?
Our guide range is about £1,720 to £3,180 per m² including VAT. A 25 m² standard-spec wraparound typically lands around £49,000 to £62,500 in Larne before design and council fees.
Is a wraparound better than a side return alone?
It adds far more space, but costs more and needs planning permission more often. Our comparison guide sets the two side by side.
Book a free site visit in Larne
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.