Wraparound extensions in Hayes (Hillingdon): design, approvals and build
Planning a wraparound extension in Hayes (Hillingdon)? We survey the house, work out the planning route, draw the design and build it, so you deal with one team from the first visit to the completion certificate.
- Guide price in Hayes (Hillingdon)From £46,500 inc VAT
- PlanningUsually a householder application
- Build time14–20 weeks on site
- Postcode districtsUB1, UB2, UB3, UB4, UB7

How much does a wraparound extension cost in Hayes (Hillingdon)?
These guide figures apply our London adjustment (×1.3) to national rates. They include VAT at 20% and cover the build itself; design and council fees are listed separately.
Typical rates in Hayes (Hillingdon): £2,600 to £4,810 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| Compact L-shape 18 m² | £46,500 – £56,500 | £53,500 – £68,000 | £67,500 – £87,000 |
| Medium L-shape 25 m² | £65,000 – £78,000 | £74,500 – £94,500 | £94,000 – £120,500 |
| Large L-shape 32 m² | £83,000 – £100,000 | £95,500 – £121,000 | £120,500 – £154,000 |
Try the guide-price tool to see a range for your own size and finish.
Working in Hayes (Hillingdon)
Postcode districts we cover around Hayes (Hillingdon) include UB1, UB2, UB3, UB4, UB7, UB11. Nearby, we also take on projects in Southall (2 miles), South Ruislip (3 miles), Heston (3 miles), Greenford (3 miles).
Across London, terraced houses with narrow side returns and tight access are the norm, which shapes everything from party wall notices to how materials reach the back garden.
Do I need planning permission in Hayes (Hillingdon)?
In England a wraparound extension is assessed as both a side and a rear extension, and the combination usually falls outside permitted development, so most need a householder planning application (£548 from 1 April 2026).
Homes in conservation areas, national parks, National Landscapes (formerly AONBs), the Broads and World Heritage Sites have tighter rules, so we always check the property's status and planning history before design starts.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Applications are decided by the local planning authority (your district, borough or unitary council).
What is included
- Full internal finish or kitchen-ready shell
- Structural design for the corner and openings
- Roof with glazing along the side return
- Survey, design and 3D layout options
- Householder planning application
The corner is where wraparounds succeed or fail. We usually use a single steel goalpost or a corner post hidden in a pier, and set the glazing so the new room reads as one space rather than two boxes.
How the project works
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.
Design and approvals
Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.
Fixed written price
You receive a written, itemised price and programme. Nothing starts until you are happy with it.
Build and sign-off
We build it with one project manager, book the building control inspections and hand over the completion certificate.
Questions people ask about wraparound extensions
Do you cover all of Hayes (Hillingdon)?
Yes. We cover Hayes (Hillingdon) and the surrounding parts of Greater London. Site visits are free and there is no obligation.
How long does a wraparound extension take to build in Hayes (Hillingdon)?
On site, typically 14 to 20 weeks once approvals are in place. Before that, allow 8–16 weeks design and approvals.
Do I need building regulations approval in Hayes (Hillingdon)?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Is a wraparound better than a side return alone?
It adds far more space, but costs more and needs planning permission more often. Our comparison guide sets the two side by side.
Will I need to move a drain?
Often. Side returns frequently contain a manhole or a shared drain. Building near or over a public sewer needs the water company’s consent in England and Wales, which we arrange.
Book a free site visit in Hayes (Hillingdon)
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.