Wraparound extensions in Hastings: design, approvals and build
Hastings homeowners can use us for the whole wraparound extension project: survey, design, planning or permitted development checks, building regulations and the build itself.
- Guide price in HastingsFrom £40,000 inc VAT
- PlanningUsually a householder application
- Build time14–20 weeks on site
- Postcode districtsTN34, TN35, TN37, TN38, TN40

Who a wraparound extension suits
- Semi-detached houses with a side passage
- Families who want kitchen, dining and living in one space
- Terraced houses that want the largest ground floor possible
The corner is where wraparounds succeed or fail. We usually use a single steel goalpost or a corner post hidden in a pier, and set the glazing so the new room reads as one space rather than two boxes.
Covering Hastings
Our survey diary covers Hastings, including TN34, TN35, TN37, TN38, TN40. The same team covers Bexhill-on-Sea (5 miles), Hailsham (14 miles), Eastbourne (14 miles), Seaford (22 miles), all within easy reach.
Tunbridge Wells, in Kent, is roughly 24 miles from Hastings and also on our list. In the South East, plenty of houses have already been extended once, which makes checking the remaining permitted development allowance an important early step.
What should I budget for a wraparound extension in Hastings?
For Hastings we adjust our national guide rates by ×1.12, the factor we use for South East England. Figures include VAT; your written quote after the survey replaces them.
Typical rates in Hastings: £2,240 to £4,140 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| Compact L-shape 18 m² | £40,000 – £48,500 | £46,000 – £58,500 | £58,000 – £75,000 |
| Medium L-shape 25 m² | £56,000 – £67,500 | £64,000 – £81,500 | £81,000 – £104,000 |
| Large L-shape 32 m² | £71,500 – £86,500 | £82,000 – £104,000 | £103,500 – £133,000 |
Try the guide-price tool to see a range for your own size and finish.
Will the council need to approve it?
In England a wraparound extension is assessed as both a side and a rear extension, and the combination usually falls outside permitted development, so most need a householder planning application (£548 from 1 April 2026).
The planning position for a specific Hastings address depends on its history and any designations, which is why we check it at the first visit.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Applications are decided by the local planning authority (your district, borough or unitary council).
Our process, step by step
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
It starts with a visit to your house to measure, check access and talk through ideas and budget.
Design and approvals
Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.
Fixed written price
The price is fixed in writing once the design is settled, with a clear programme and payment stages.
Build and sign-off
We build it with one project manager, book the building control inspections and hand over the completion certificate.
Your questions about a wraparound extension in Hastings
How long does a wraparound extension take to build in Hastings?
On site, typically 14 to 20 weeks once approvals are in place. Before that, allow 8–16 weeks design and approvals.
Who do I contract with for a wraparound extension in Hastings?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
Will my neighbours in Hastings be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Do wraparound extensions need planning permission?
Usually, yes. In England the side element counts as a side extension and the rear element as a rear extension, and the combination normally falls outside permitted development. A householder application costs £548 in England from 1 April 2026.
Will I need to move a drain?
Often. Side returns frequently contain a manhole or a shared drain. Building near or over a public sewer needs the water company’s consent in England and Wales, which we arrange.
Book a free site visit in Hastings
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end