house-extension.uk

Wraparound extensions in Golders Green

A wraparound extension in Golders Green starts with the right design and the right approval route. We take care of both, then build it with our own project management.

  • Guide price in Golders GreenFrom £46,500 inc VAT
  • PlanningUsually a householder application
  • Build time14–20 weeks on site
  • Postcode districtsN2, N3, NW2, NW4, NW11
L-shaped wraparound extension on a brick terraced house at dusk

Covering Golders Green

Site visits are available across Golders Green (N2, N3, NW2, NW4, NW11). Neighbouring towns we cover include Cricklewood (2 miles), Kilburn (2 miles), Finchley (2 miles), Muswell Hill (3 miles).

For homes towards Hertfordshire, Borehamwood is around 6 miles away. Across London, terraced houses with narrow side returns and tight access are the norm, which shapes everything from party wall notices to how materials reach the back garden.

Do I need planning permission in Golders Green?

In England a wraparound extension is assessed as both a side and a rear extension, and the combination usually falls outside permitted development, so most need a householder planning application (£548 from 1 April 2026).

The planning position for a specific Golders Green address depends on its history and any designations, which is why we check it at the first visit.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.

Applications are decided by the local planning authority (your district, borough or unitary council).

What is included

  • Roof with glazing along the side return
  • Structural design for the corner and openings
  • Foundations, drainage and any manhole relocation
  • Party wall notice support (England and Wales)
  • Survey, design and 3D layout options

The corner is where wraparounds succeed or fail. We usually use a single steel goalpost or a corner post hidden in a pier, and set the glazing so the new room reads as one space rather than two boxes.

Guide prices for Golders Green

For Golders Green we adjust our national guide rates by ×1.3, the factor we use for London. Figures include VAT; your written quote after the survey replaces them.

Typical rates in Golders Green: £2,600 to £4,810 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
Compact L-shape
18 m²
£46,500 – £56,500£53,500 – £68,000£67,500 – £87,000
Medium L-shape
25 m²
£65,000 – £78,000£74,500 – £94,500£94,000 – £120,500
Large L-shape
32 m²
£83,000 – £100,000£95,500 – £121,000£120,500 – £154,000

Want a range for your exact size? The guide-price tool takes about a minute.

How the project works

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    First, a site visit: we look at the house, garden, access and drains and listen to what you need.

  2. Design and approvals

    We produce the drawings and structural design, and manage the approvals so they are in place before work starts.

  3. Fixed written price

    We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.

  4. Build and sign-off

    The build is managed from start to finish, inspected at each stage and signed off on completion.

Common questions in Golders Green

How long does a wraparound extension take to build in Golders Green?

On site, typically 14 to 20 weeks once approvals are in place. Before that, allow 8–16 weeks design and approvals.

Who do I contract with for a wraparound extension in Golders Green?

Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.

Do I need building regulations approval in Golders Green?

Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.

Will I need to move a drain?

Often. Side returns frequently contain a manhole or a shared drain. Building near or over a public sewer needs the water company’s consent in England and Wales, which we arrange.

Do wraparound extensions need planning permission?

Usually, yes. In England the side element counts as a side extension and the rear element as a rear extension, and the combination normally falls outside permitted development. A householder application costs £548 in England from 1 April 2026.

Book a free site visit in Golders Green

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote