Wraparound extensions across Durham
Durham homeowners can use us for the whole wraparound extension project: survey, design, planning or permitted development checks, building regulations and the build itself.
- Guide price in DurhamFrom £32,500 inc VAT
- PlanningUsually a householder application
- Build time14–20 weeks on site
- Postcode districtsDH1

Wraparound extension prices in Durham
Labour and material costs vary across the UK, so for Durham we use our North East England factor (×0.91). The ranges include VAT and exclude design, structural and council fees.
Typical rates in Durham: £1,820 to £3,370 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| Compact L-shape 18 m² | £32,500 – £39,500 | £37,500 – £48,000 | £47,500 – £61,000 |
| Medium L-shape 25 m² | £45,500 – £55,000 | £52,000 – £66,000 | £65,500 – £84,500 |
| Large L-shape 32 m² | £58,000 – £70,000 | £66,500 – £84,500 | £84,000 – £108,000 |
For a figure based on your own dimensions, use our guide-price tool.
Working in Durham
Our survey diary covers Durham, including DH1. The same team covers Chester-le-Street (6 miles), Stanley (8 miles), Bishop Auckland (9 miles), Peterlee (10 miles), all within easy reach.
Across the North East, houses often have rear yards or modest gardens, so compact, well-lit single-storey extensions make the biggest difference.
Will the council need to approve it?
In England a wraparound extension is assessed as both a side and a rear extension, and the combination usually falls outside permitted development, so most need a householder planning application (£548 from 1 April 2026).
In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Applications are decided by the local planning authority (your district, borough or unitary council).
Who a wraparound extension suits
- Families who want kitchen, dining and living in one space
- Semi-detached houses with a side passage
- Terraced houses that want the largest ground floor possible
What happens next
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
It starts with a visit to your house to measure, check access and talk through ideas and budget.
Design and approvals
Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.
Fixed written price
With the design and specification agreed, you get a fixed written price and a start date.
Build and sign-off
The build is managed from start to finish, inspected at each stage and signed off on completion.
Your questions about a wraparound extension in Durham
Who do I contract with for a wraparound extension in Durham?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
Do I need building regulations approval in Durham?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
How long does a wraparound extension take to build in Durham?
On site, typically 14 to 20 weeks once approvals are in place. Before that, allow 8–16 weeks design and approvals.
Is a wraparound better than a side return alone?
It adds far more space, but costs more and needs planning permission more often. Our comparison guide sets the two side by side.
How much does a wraparound extension cost?
Our guide range is about £1,820 to £3,370 per m² including VAT. A 25 m² standard-spec wraparound typically lands around £52,000 to £66,000 in Durham before design and council fees.
Book a free site visit in Durham
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.