Wraparound extensions in Dorset
Planning a wraparound extension in Dorset? We survey the house, work out the planning route, draw the design and build it, so you deal with one team from the first visit to the completion certificate.
- Guide priceFrom £36,500 inc VAT
- PlanningUsually a householder application
- Towns covered9
- Site visitFree, no obligation

Towns in Dorset
Extensions in and around Dorset
Towns we cover in Dorset include Bournemouth, Poole, Weymouth, Christchurch, Dorchester, Wimborne Minster, Bridport, Ferndown. South West homes range from terraced streets in the cities to stone cottages and bungalows in the countryside, and conservation areas are common in historic centres.
What is included
- Foundations, drainage and any manhole relocation
- Roof with glazing along the side return
- Survey, design and 3D layout options
- Structural design for the corner and openings
- Full internal finish or kitchen-ready shell
- Householder planning application
Wraparound extension prices in Dorset
These guide figures apply our South West England adjustment (×1.02) to national rates. They include VAT at 20% and cover the build itself; design and council fees are listed separately.
Typical rates in Dorset: £2,040 to £3,770 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| Compact L-shape 18 m² | £36,500 – £44,500 | £42,000 – £53,500 | £53,000 – £68,000 |
| Medium L-shape 25 m² | £51,000 – £61,500 | £58,500 – £74,000 | £73,500 – £94,500 |
| Large L-shape 32 m² | £65,000 – £78,500 | £75,000 – £95,000 | £94,500 – £121,000 |
Want a range for your exact size? The guide-price tool takes about a minute.
Planning and approvals in Dorset
In England a wraparound extension is assessed as both a side and a rear extension, and the combination usually falls outside permitted development, so most need a householder planning application (£548 from 1 April 2026).
In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Applications are decided by the local planning authority (your district, borough or unitary council).
Our process, step by step
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
We visit your Dorset home, measure up, talk through what you want and check the planning position.
Design and approvals
We produce the drawings and structural design, and manage the approvals so they are in place before work starts.
Fixed written price
You receive a written, itemised price and programme. Nothing starts until you are happy with it.
Build and sign-off
The build is managed from start to finish, inspected at each stage and signed off on completion.
Your questions about a wraparound extension in Dorset
Who do I contract with for a wraparound extension in Dorset?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Dorset, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
How long does a wraparound extension take to build in Dorset?
On site, typically 14 to 20 weeks once approvals are in place. Before that, allow 8–16 weeks design and approvals.
Will I need to move a drain?
Often. Side returns frequently contain a manhole or a shared drain. Building near or over a public sewer needs the water company’s consent in England and Wales, which we arrange.
Do wraparound extensions need planning permission?
Usually, yes. In England the side element counts as a side extension and the rear element as a rear extension, and the combination normally falls outside permitted development. A householder application costs £548 in England from 1 April 2026.
Book a free site visit in Dorset
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.