Caerphilly wraparound extensions, designed and built
We design and build wraparound extensions for houses in Caerphilly, with a written price once the survey and design are done and one point of contact throughout.
- Guide price in CaerphillyFrom £33,000 inc VAT
- PlanningUsually a planning application
- Build time14–20 weeks on site
- Postcode districtsCF83

How much does a wraparound extension cost in Caerphilly?
For Caerphilly we adjust our national guide rates by ×0.93, the factor we use for Wales. Figures include VAT; your written quote after the survey replaces them.
Typical rates in Caerphilly: £1,860 to £3,440 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| Compact L-shape 18 m² | £33,000 – £40,500 | £38,500 – £49,000 | £48,500 – £62,000 |
| Medium L-shape 25 m² | £46,500 – £56,000 | £53,000 – £67,500 | £67,000 – £86,500 |
| Large L-shape 32 m² | £59,500 – £71,500 | £68,000 – £86,500 | £86,000 – £110,500 |
Want a range for your exact size? The guide-price tool takes about a minute.
When a wraparound extension makes sense
- Semi-detached houses with a side passage
- Families who want kitchen, dining and living in one space
- Terraced houses that want the largest ground floor possible
Working in Caerphilly
Our survey diary covers Caerphilly, including CF83. Neighbouring towns we cover include Risca (6 miles), Pontypridd (6 miles), Gelligaer (6 miles), Blackwood (6 miles).
In Wales, terraced houses with rear offshoots are common in the towns, while detached houses and bungalows dominate in rural areas.
Planning rules that apply in Caerphilly
In Wales a wraparound must satisfy both the rear and side extension limits to be permitted development, so most need a planning application to the council.
In a conservation area, national park, National Landscape or World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
The Party Wall etc. Act 1996 applies in Wales as in England: notice must be served before work to a shared wall, building on the boundary, or excavating close to a neighbour's foundations.
Applications are decided by the local planning authority (your county or county borough council, or the national park authority).
Our process, step by step
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.
Design and approvals
We draw the design, agree it with you and handle planning or permitted development checks and building regulations.
Fixed written price
With the design and specification agreed, you get a fixed written price and a start date.
Build and sign-off
Work is carried out to the agreed programme, inspected by building control and signed off at the end.
Wraparound extension questions answered
How long does a wraparound extension take to build in Caerphilly?
On site, typically 14 to 20 weeks once approvals are in place. Before that, allow 8–16 weeks design and approvals.
Do I need building regulations approval in Caerphilly?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Do you cover all of Caerphilly?
Yes. We cover Caerphilly and the surrounding parts of Mid Glamorgan. Site visits are free and there is no obligation.
Is a wraparound better than a side return alone?
It adds far more space, but costs more and needs planning permission more often. Our comparison guide sets the two side by side.
Will I need to move a drain?
Often. Side returns frequently contain a manhole or a shared drain. Building near or over a public sewer needs the water company’s consent in England and Wales, which we arrange.
Book a free site visit in Caerphilly
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.