Wraparound extensions in Burton upon Trent
Our design and build teams take on wraparound extensions in Burton upon Trent, from the first measured survey through planning and building control to the finished room.
- Guide price in Burton upon TrentFrom £34,500 inc VAT
- PlanningUsually a householder application
- Build time14–20 weeks on site
- Postcode districtsDE13, DE14, DE15

How much does a wraparound extension cost in Burton upon Trent?
Prices below are for Burton upon Trent, using the West Midlands factor of ×0.97. They are guide ranges including VAT for the build only, not a quote.
Typical rates in Burton upon Trent: £1,940 to £3,590 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| Compact L-shape 18 m² | £34,500 – £42,000 | £40,000 – £51,000 | £50,500 – £65,000 |
| Medium L-shape 25 m² | £48,500 – £58,500 | £55,500 – £70,500 | £70,000 – £90,000 |
| Large L-shape 32 m² | £62,000 – £74,500 | £71,000 – £90,500 | £90,000 – £115,000 |
Want a range for your exact size? The guide-price tool takes about a minute.
Working in Burton upon Trent
Site visits are available across Burton upon Trent (DE13, DE14, DE15). We also work in nearby Lichfield (12 miles), Tamworth (12 miles), Rugeley (13 miles), Burntwood (15 miles).
The West Midlands has a large stock of 1930s and post-war semi-detached houses, which are well suited to rear, side and over-garage extensions, plus Victorian terraces in the older inner areas.
When a wraparound extension makes sense
- Terraced houses that want the largest ground floor possible
- Semi-detached houses with a side passage
- Families who want kitchen, dining and living in one space
The corner is where wraparounds succeed or fail. We usually use a single steel goalpost or a corner post hidden in a pier, and set the glazing so the new room reads as one space rather than two boxes.
Will the council need to approve it?
In England a wraparound extension is assessed as both a side and a rear extension, and the combination usually falls outside permitted development, so most need a householder planning application (£548 from 1 April 2026).
In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Applications are decided by the local planning authority (your district, borough or unitary council).
From first visit to completion
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
It starts with a visit to your house to measure, check access and talk through ideas and budget.
Design and approvals
Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.
Fixed written price
With the design and specification agreed, you get a fixed written price and a start date.
Build and sign-off
Work is carried out to the agreed programme, inspected by building control and signed off at the end.
Your questions about a wraparound extension in Burton upon Trent
Will my neighbours in Burton upon Trent be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Do I need building regulations approval in Burton upon Trent?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Do you cover all of Burton upon Trent?
Yes. We cover Burton upon Trent and the surrounding parts of Staffordshire. Site visits are free and there is no obligation.
Is a wraparound better than a side return alone?
It adds far more space, but costs more and needs planning permission more often. Our comparison guide sets the two side by side.
Will I need to move a drain?
Often. Side returns frequently contain a manhole or a shared drain. Building near or over a public sewer needs the water company’s consent in England and Wales, which we arrange.
Book a free site visit in Burton upon Trent
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.