Benfleet wraparound extensions, designed and built
Planning a wraparound extension in Benfleet? We survey the house, work out the planning route, draw the design and build it, so you deal with one team from the first visit to the completion certificate.
- Guide price in BenfleetFrom £38,000 inc VAT
- PlanningUsually a householder application
- Build time14–20 weeks on site
- Postcode districtsSS7, SS8, SS13

How much does a wraparound extension cost in Benfleet?
For Benfleet we adjust our national guide rates by ×1.06, the factor we use for East of England. Figures include VAT; your written quote after the survey replaces them.
Typical rates in Benfleet: £2,120 to £3,920 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| Compact L-shape 18 m² | £38,000 – £46,000 | £43,500 – £55,500 | £55,000 – £71,000 |
| Medium L-shape 25 m² | £53,000 – £64,000 | £60,500 – £77,000 | £76,500 – £98,500 |
| Large L-shape 32 m² | £67,500 – £81,500 | £78,000 – £98,500 | £98,000 – £126,000 |
Want a range for your exact size? The guide-price tool takes about a minute.
Extensions in and around Benfleet
Postcode districts we cover around Benfleet include SS7, SS8, SS13. The same team covers Hadleigh (2 miles), Canvey Island (2 miles), Rayleigh (3 miles), Wickford (4 miles), all within easy reach.
Gravesend, in Kent, is roughly 11 miles from Benfleet and also on our list. Across the East of England many houses sit on generous plots, and single-storey and wraparound extensions are a natural fit.
Planning and approvals in Benfleet
In England a wraparound extension is assessed as both a side and a rear extension, and the combination usually falls outside permitted development, so most need a householder planning application (£548 from 1 April 2026).
The planning position for a specific Benfleet address depends on its history and any designations, which is why we check it at the first visit.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Applications are decided by the local planning authority (your district, borough or unitary council).
Is a wraparound extension right for your house?
- Semi-detached houses with a side passage
- Terraced houses that want the largest ground floor possible
- Families who want kitchen, dining and living in one space
The corner is where wraparounds succeed or fail. We usually use a single steel goalpost or a corner post hidden in a pier, and set the glazing so the new room reads as one space rather than two boxes.
Our process, step by step
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
First, a site visit: we look at the house, garden, access and drains and listen to what you need.
Design and approvals
We produce the drawings and structural design, and manage the approvals so they are in place before work starts.
Fixed written price
We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.
Build and sign-off
We build it with one project manager, book the building control inspections and hand over the completion certificate.
Wraparound extension questions answered
Who do I contract with for a wraparound extension in Benfleet?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
How long does a wraparound extension take to build in Benfleet?
On site, typically 14 to 20 weeks once approvals are in place. Before that, allow 8–16 weeks design and approvals.
Do I need building regulations approval in Benfleet?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Will I need to move a drain?
Often. Side returns frequently contain a manhole or a shared drain. Building near or over a public sewer needs the water company’s consent in England and Wales, which we arrange.
Is a wraparound better than a side return alone?
It adds far more space, but costs more and needs planning permission more often. Our comparison guide sets the two side by side.
Book a free site visit in Benfleet
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.