Wraparound extensions across Atherton
Thinking about a wraparound extension for your Atherton home? Start with a free site visit: we measure up, check what the council will allow and give you honest guide figures on the day.
- Guide price in AthertonFrom £34,000 inc VAT
- PlanningUsually a householder application
- Build time14–20 weeks on site
- Postcode districtsBL5, M29, M46, WN7

Included in a typical project
- Roof with glazing along the side return
- Structural design for the corner and openings
- Full internal finish or kitchen-ready shell
- Householder planning application
- Foundations, drainage and any manhole relocation
How much does a wraparound extension cost in Atherton?
Labour and material costs vary across the UK, so for Atherton we use our North West England factor (×0.95). The ranges include VAT and exclude design, structural and council fees.
Typical rates in Atherton: £1,900 to £3,520 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| Compact L-shape 18 m² | £34,000 – £41,500 | £39,000 – £50,000 | £49,500 – £63,500 |
| Medium L-shape 25 m² | £47,500 – £57,000 | £54,500 – £69,000 | £68,500 – £88,000 |
| Large L-shape 32 m² | £60,500 – £73,000 | £69,500 – £88,500 | £88,000 – £112,500 |
Want a range for your exact size? The guide-price tool takes about a minute.
Will the council need to approve it?
In England a wraparound extension is assessed as both a side and a rear extension, and the combination usually falls outside permitted development, so most need a householder planning application (£548 from 1 April 2026).
In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Applications are decided by the local planning authority (your district, borough or unitary council).
Extensions in and around Atherton
Postcode districts we cover around Atherton include BL5, M29, M46, WN7. Nearby, we also take on projects in Tyldesley (1 mile), Westhoughton (2 miles), Leigh (2 miles), Hindley (4 miles).
Just over the Merseyside border, Golborne is about 5 miles away. Across the North West, terraced houses with small rear yards suit compact rear and side return extensions, while suburban semis have room for more.
How the project works
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
It starts with a visit to your house to measure, check access and talk through ideas and budget.
Design and approvals
Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.
Fixed written price
We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.
Build and sign-off
Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.
Wraparound extension questions answered
How long does a wraparound extension take to build in Atherton?
On site, typically 14 to 20 weeks once approvals are in place. Before that, allow 8–16 weeks design and approvals.
Do you cover all of Atherton?
Yes. We cover Atherton and the surrounding parts of Greater Manchester. Site visits are free and there is no obligation.
Will my neighbours in Atherton be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Is a wraparound better than a side return alone?
It adds far more space, but costs more and needs planning permission more often. Our comparison guide sets the two side by side.
Do wraparound extensions need planning permission?
Usually, yes. In England the side element counts as a side extension and the rear element as a rear extension, and the combination normally falls outside permitted development. A householder application costs £548 in England from 1 April 2026.
Book a free site visit in Atherton
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.