house-extension.uk

Utility and boot room extensions across Palmers Green

Palmers Green homeowners can use us for the whole utility room extension project: survey, design, planning or permitted development checks, building regulations and the build itself.

  • Guide price in Palmers GreenFrom £18,000 inc VAT
  • PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
  • Build time6–10 weeks on site
  • Postcode districtsN11, N13, N14, N21, N22
Utility and boot room with stacked washer and dryer, bench and coat hooks

How much does a utility room extension cost in Palmers Green?

Prices below are for Palmers Green, using the London factor of ×1.3. They are guide ranges including VAT for the build only, not a quote.

Typical rates in Palmers Green: £2,470 to £4,550 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
2 m × 2.5 m
5 m²
£18,000 – £22,000£18,000 – £23,000£18,000 – £23,000
2.5 m × 3.2 m
8 m²
£19,500 – £23,500£23,000 – £29,500£29,000 – £36,500
3 m × 3.6 m
11 m²
£27,000 – £32,500£32,000 – £40,500£40,000 – £50,500

For a figure based on your own dimensions, use our guide-price tool.

Will the council need to approve it?

In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.

Before any drawing is finalised we check whether the house is listed, in a conservation area or subject to an Article 4 direction.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.

Applications are decided by the local planning authority (your district, borough or unitary council).

Who a utility room extension suits

  • Houses with a side passage or small rear corner
  • Kitchens that have run out of space for appliances
  • Busy family homes

A good utility works like a back-of-house corridor: in from the garden, boots off, coats on hooks, washing on the way through. We plan the door positions so it doesn't become another room to walk around.

Working in Palmers Green

Our survey diary covers Palmers Green, including N11, N13, N14, N21, N22. Nearby, we also take on projects in Wood Green (1 mile), Tottenham (2 miles), Friern Barnet (2 miles), Edmonton (2 miles).

In London, space is at a premium and gardens are often short, so side returns, wraparounds and carefully planned rear extensions tend to make the most of every metre.

From first visit to completion

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.

  2. Design and approvals

    Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.

  3. Fixed written price

    With the design and specification agreed, you get a fixed written price and a start date.

  4. Build and sign-off

    The build is managed from start to finish, inspected at each stage and signed off on completion.

Utility room extension questions answered

How long does a utility room extension take to build in Palmers Green?

On site, typically 6 to 10 weeks once approvals are in place. Before that, allow 4–10 weeks design and approvals.

Will my neighbours in Palmers Green be involved?

If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.

Do you cover all of Palmers Green?

Yes. We cover Palmers Green and the surrounding parts of Greater London. Site visits are free and there is no obligation.

Can a utility have a toilet?

Yes, space permitting. A WC needs drainage and extraction, which we plan into the design.

Does a utility extension need planning permission?

Often not, if it is single storey and within permitted development limits. We check this for your property.

Book a free site visit in Palmers Green

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote