Utility and boot room extensions for homes in Marlow
Marlow homeowners can use us for the whole utility room extension project: survey, design, planning or permitted development checks, building regulations and the build itself.
- Guide price in MarlowFrom £15,500 inc VAT
- PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
- Build time6–10 weeks on site
- Postcode districtsSL7

What we take care of
- Built-in storage or space ready for your units
- Design around appliances, sink and storage
- Ventilation for a tumble dryer
- Back door and a hard-wearing floor
- Waste and water connections
Extensions in and around Marlow
We cover Marlow and the postcode districts SL7. Neighbouring towns we cover include High Wycombe (4 miles), Gerrards Cross (9 miles), Amersham (10 miles), Chalfont St Peter (10 miles).
For homes towards Berkshire, Maidenhead is around 4 miles away. In the South East, plenty of houses have already been extended once, which makes checking the remaining permitted development allowance an important early step.
How much does a utility room extension cost in Marlow?
For Marlow we adjust our national guide rates by ×1.12, the factor we use for South East England. Figures include VAT; your written quote after the survey replaces them.
Typical rates in Marlow: £2,130 to £3,920 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 2 m × 2.5 m 5 m² | £15,500 – £19,000 | £15,500 – £20,000 | £15,500 – £20,000 |
| 2.5 m × 3.2 m 8 m² | £17,000 – £20,500 | £20,000 – £25,500 | £25,000 – £31,500 |
| 3 m × 3.6 m 11 m² | £23,000 – £28,000 | £27,500 – £34,500 | £34,000 – £43,500 |
Try the guide-price tool to see a range for your own size and finish.
Planning and approvals in Marlow
In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.
The planning position for a specific Marlow address depends on its history and any designations, which is why we check it at the first visit.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Applications are decided by the local planning authority (your district, borough or unitary council).
Our process, step by step
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
First, a site visit: we look at the house, garden, access and drains and listen to what you need.
Design and approvals
We produce the drawings and structural design, and manage the approvals so they are in place before work starts.
Fixed written price
The price is fixed in writing once the design is settled, with a clear programme and payment stages.
Build and sign-off
Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.
Questions people ask about utility room extensions
Who do I contract with for a utility room extension in Marlow?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
Do you cover all of Marlow?
Yes. We cover Marlow and the surrounding parts of Buckinghamshire. Site visits are free and there is no obligation.
How long does a utility room extension take to build in Marlow?
On site, typically 6 to 10 weeks once approvals are in place. Before that, allow 4–10 weeks design and approvals.
Does a utility extension need planning permission?
Often not, if it is single storey and within permitted development limits. We check this for your property.
Can a utility have a toilet?
Yes, space permitting. A WC needs drainage and extraction, which we plan into the design.
Book a free site visit in Marlow
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.