Harlesden utility room extensions, designed and built
From the first sketch to final sign-off, we plan and build utility room extensions in Harlesden and the surrounding Greater London area.
- Guide price in HarlesdenFrom £18,000 inc VAT
- PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
- Build time6–10 weeks on site
- Postcode districtsNW10

Extensions in and around Harlesden
We cover Harlesden and the postcode districts NW10. The same team covers Willesden (1 mile), Cricklewood (2 miles), Wembley (2 miles), Acton (2 miles), all within easy reach.
For homes towards Hertfordshire, Borehamwood is around 8 miles away. London's housing is dominated by Victorian and Edwardian terraces, many with a rear outrigger and a side return, and 1930s semis in the outer boroughs. Conservation areas are common, so the planning check comes first.
Guide prices for Harlesden
These guide figures apply our London adjustment (×1.3) to national rates. They include VAT at 20% and cover the build itself; design and council fees are listed separately.
Typical rates in Harlesden: £2,470 to £4,550 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 2 m × 2.5 m 5 m² | £18,000 – £22,000 | £18,000 – £23,000 | £18,000 – £23,000 |
| 2.5 m × 3.2 m 8 m² | £19,500 – £23,500 | £23,000 – £29,500 | £29,000 – £36,500 |
| 3 m × 3.6 m 11 m² | £27,000 – £32,500 | £32,000 – £40,500 | £40,000 – £50,500 |
For a figure based on your own dimensions, use our guide-price tool.
Who a utility room extension suits
- Houses with a side passage or small rear corner
- Busy family homes
- Kitchens that have run out of space for appliances
A good utility works like a back-of-house corridor: in from the garden, boots off, coats on hooks, washing on the way through. We plan the door positions so it doesn't become another room to walk around.
Planning rules that apply in Harlesden
In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.
The planning position for a specific Harlesden address depends on its history and any designations, which is why we check it at the first visit.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Applications are decided by the local planning authority (your district, borough or unitary council).
From first visit to completion
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.
Design and approvals
We draw the design, agree it with you and handle planning or permitted development checks and building regulations.
Fixed written price
The price is fixed in writing once the design is settled, with a clear programme and payment stages.
Build and sign-off
Work is carried out to the agreed programme, inspected by building control and signed off at the end.
Utility room extension questions answered
Do I need building regulations approval in Harlesden?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Who do I contract with for a utility room extension in Harlesden?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
Do you cover all of Harlesden?
Yes. We cover Harlesden and the surrounding parts of Greater London. Site visits are free and there is no obligation.
Does a utility extension need planning permission?
Often not, if it is single storey and within permitted development limits. We check this for your property.
Can a utility have a toilet?
Yes, space permitting. A WC needs drainage and extraction, which we plan into the design.
Book a free site visit in Harlesden
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.