Greenwich utility room extensions, designed and built
If you live in Greenwich and want more space without moving, a utility room extension is one of the most practical ways to get it. We handle the drawings, approvals and the build.
- Guide price in GreenwichFrom £18,000 inc VAT
- PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
- Build time6–10 weeks on site
- Postcode districtsSE3, SE4, SE8, SE10, SE13

Who a utility room extension suits
- Kitchens that have run out of space for appliances
- Busy family homes
- Houses with a side passage or small rear corner
Guide prices for Greenwich
These guide figures apply our London adjustment (×1.3) to national rates. They include VAT at 20% and cover the build itself; design and council fees are listed separately.
Typical rates in Greenwich: £2,470 to £4,550 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 2 m × 2.5 m 5 m² | £18,000 – £22,000 | £18,000 – £23,000 | £18,000 – £23,000 |
| 2.5 m × 3.2 m 8 m² | £19,500 – £23,500 | £23,000 – £29,500 | £29,000 – £36,500 |
| 3 m × 3.6 m 11 m² | £27,000 – £32,500 | £32,000 – £40,500 | £40,000 – £50,500 |
Want a range for your exact size? The guide-price tool takes about a minute.
Planning rules that apply in Greenwich
In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.
Before any drawing is finalised we check whether the house is listed, in a conservation area or subject to an Article 4 direction.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Applications are decided by the local planning authority (your district, borough or unitary council).
Covering Greenwich
We cover Greenwich and the postcode districts SE3, SE4, SE8, SE10, SE13, SE14. We also work in nearby New Cross (1 mile), Blackheath (1 mile), Brockley (1 mile), Catford (2 miles).
In London, space is at a premium and gardens are often short, so side returns, wraparounds and carefully planned rear extensions tend to make the most of every metre.
From first visit to completion
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
It starts with a visit to your house to measure, check access and talk through ideas and budget.
Design and approvals
We draw the design, agree it with you and handle planning or permitted development checks and building regulations.
Fixed written price
With the design and specification agreed, you get a fixed written price and a start date.
Build and sign-off
We build it with one project manager, book the building control inspections and hand over the completion certificate.
Utility room extension questions answered
Who do I contract with for a utility room extension in Greenwich?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
Do you cover all of Greenwich?
Yes. We cover Greenwich and the surrounding parts of Greater London. Site visits are free and there is no obligation.
Do I need building regulations approval in Greenwich?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
How much does a utility room extension cost?
Our guide range is about £2,470 to £4,550 per m² including VAT, with a minimum of around £18,500. An 8 m² standard-spec utility is typically £23,000 to £29,500 in Greenwich.
Can a utility have a toilet?
Yes, space permitting. A WC needs drainage and extraction, which we plan into the design.
Book a free site visit in Greenwich
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.