Eltham utility room extensions, designed and built
Planning a utility room extension in Eltham? We survey the house, work out the planning route, draw the design and build it, so you deal with one team from the first visit to the completion certificate.
- Guide price in ElthamFrom £18,000 inc VAT
- PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
- Build time6–10 weeks on site
- Postcode districtsDA15, SE3, SE7, SE9, SE12

Extensions in and around Eltham
Across DA15, SE3, SE7, SE9, SE12, SE18, we can visit, measure and advise. Neighbouring towns we cover include Blackheath (2 miles), Chislehurst (2 miles), Welling (3 miles), Plumstead (3 miles).
London's housing is dominated by Victorian and Edwardian terraces, many with a rear outrigger and a side return, and 1930s semis in the outer boroughs. Conservation areas are common, so the planning check comes first.
Guide prices for Eltham
For Eltham we adjust our national guide rates by ×1.3, the factor we use for London. Figures include VAT; your written quote after the survey replaces them.
Typical rates in Eltham: £2,470 to £4,550 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 2 m × 2.5 m 5 m² | £18,000 – £22,000 | £18,000 – £23,000 | £18,000 – £23,000 |
| 2.5 m × 3.2 m 8 m² | £19,500 – £23,500 | £23,000 – £29,500 | £29,000 – £36,500 |
| 3 m × 3.6 m 11 m² | £27,000 – £32,500 | £32,000 – £40,500 | £40,000 – £50,500 |
For a figure based on your own dimensions, use our guide-price tool.
Do I need planning permission in Eltham?
In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.
In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Applications are decided by the local planning authority (your district, borough or unitary council).
Who a utility room extension suits
- Busy family homes
- Houses with a side passage or small rear corner
- Kitchens that have run out of space for appliances
A good utility works like a back-of-house corridor: in from the garden, boots off, coats on hooks, washing on the way through. We plan the door positions so it doesn't become another room to walk around.
From first visit to completion
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.
Design and approvals
We produce the drawings and structural design, and manage the approvals so they are in place before work starts.
Fixed written price
We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.
Build and sign-off
The build is managed from start to finish, inspected at each stage and signed off on completion.
Questions people ask about utility room extensions
How long does a utility room extension take to build in Eltham?
On site, typically 6 to 10 weeks once approvals are in place. Before that, allow 4–10 weeks design and approvals.
Do I need building regulations approval in Eltham?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Will my neighbours in Eltham be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Does a utility extension need planning permission?
Often not, if it is single storey and within permitted development limits. We check this for your property.
Can a utility have a toilet?
Yes, space permitting. A WC needs drainage and extraction, which we plan into the design.
Book a free site visit in Eltham
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.