Cheadle Hulme utility room extensions, designed and built
Cheadle Hulme homeowners can use us for the whole utility room extension project: survey, design, planning or permitted development checks, building regulations and the build itself.
- Guide price in Cheadle HulmeFrom £13,000 inc VAT
- PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
- Build time6–10 weeks on site
- Postcode districtsSK3, SK7, SK8

Extensions in and around Cheadle Hulme
Postcode districts we cover around Cheadle Hulme include SK3, SK7, SK8. Neighbouring towns we cover include Stockport (3 miles), Hazel Grove (3 miles), Denton (6 miles), Sale (7 miles).
For homes towards Cheshire, Wilmslow is around 4 miles away. Across the North West, terraced houses with small rear yards suit compact rear and side return extensions, while suburban semis have room for more.
Guide prices for Cheadle Hulme
Labour and material costs vary across the UK, so for Cheadle Hulme we use our North West England factor (×0.95). The ranges include VAT and exclude design, structural and council fees.
Typical rates in Cheadle Hulme: £1,800 to £3,320 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 2 m × 2.5 m 5 m² | £13,000 – £16,000 | £13,000 – £17,000 | £13,000 – £17,000 |
| 2.5 m × 3.2 m 8 m² | £14,000 – £17,500 | £17,000 – £21,500 | £21,000 – £27,000 |
| 3 m × 3.6 m 11 m² | £19,500 – £24,000 | £23,500 – £29,500 | £29,000 – £37,000 |
Want a range for your exact size? The guide-price tool takes about a minute.
Is a utility room extension right for your house?
- Houses with a side passage or small rear corner
- Busy family homes
- Kitchens that have run out of space for appliances
Planning rules that apply in Cheadle Hulme
In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.
In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Applications are decided by the local planning authority (your district, borough or unitary council).
From first visit to completion
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.
Design and approvals
We draw the design, agree it with you and handle planning or permitted development checks and building regulations.
Fixed written price
You receive a written, itemised price and programme. Nothing starts until you are happy with it.
Build and sign-off
Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.
Your questions about a utility room extension in Cheadle Hulme
Who do I contract with for a utility room extension in Cheadle Hulme?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
Will my neighbours in Cheadle Hulme be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Do you cover all of Cheadle Hulme?
Yes. We cover Cheadle Hulme and the surrounding parts of Greater Manchester. Site visits are free and there is no obligation.
Does a utility extension need planning permission?
Often not, if it is single storey and within permitted development limits. We check this for your property.
Can a utility have a toilet?
Yes, space permitting. A WC needs drainage and extraction, which we plan into the design.
Book a free site visit in Cheadle Hulme
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.