house-extension.uk

Utility and boot room extensions across Burntwood

We design and build utility room extensions for houses in Burntwood, with a written price once the survey and design are done and one point of contact throughout.

  • Guide price in BurntwoodFrom £13,500 inc VAT
  • PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
  • Build time6–10 weeks on site
  • Postcode districtsWS7
Utility and boot room with stacked washer and dryer, bench and coat hooks

Extensions in and around Burntwood

Site visits are available across Burntwood (WS7). Neighbouring towns we cover include Great Wyrley (4 miles), Lichfield (4 miles), Cannock (4 miles), Rugeley (5 miles).

The West Midlands has a large stock of 1930s and post-war semi-detached houses, which are well suited to rear, side and over-garage extensions, plus Victorian terraces in the older inner areas.

Utility room extension prices in Burntwood

For Burntwood we adjust our national guide rates by ×0.97, the factor we use for West Midlands. Figures include VAT; your written quote after the survey replaces them.

Typical rates in Burntwood: £1,840 to £3,400 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
2 m × 2.5 m
5 m²
£13,500 – £16,500£13,500 – £17,000£13,500 – £17,000
2.5 m × 3.2 m
8 m²
£14,500 – £17,500£17,000 – £22,000£21,500 – £27,500
3 m × 3.6 m
11 m²
£20,000 – £24,500£24,000 – £30,000£29,500 – £37,500

Try the guide-price tool to see a range for your own size and finish.

Who a utility room extension suits

  • Busy family homes
  • Houses with a side passage or small rear corner
  • Kitchens that have run out of space for appliances

A good utility works like a back-of-house corridor: in from the garden, boots off, coats on hooks, washing on the way through. We plan the door positions so it doesn't become another room to walk around.

Do I need planning permission in Burntwood?

In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.

The planning position for a specific Burntwood address depends on its history and any designations, which is why we check it at the first visit.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.

Applications are decided by the local planning authority (your district, borough or unitary council).

From first visit to completion

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.

  2. Design and approvals

    Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.

  3. Fixed written price

    We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.

  4. Build and sign-off

    Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.

Questions people ask about utility room extensions

Will my neighbours in Burntwood be involved?

If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.

Who do I contract with for a utility room extension in Burntwood?

Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.

Do you cover all of Burntwood?

Yes. We cover Burntwood and the surrounding parts of Staffordshire. Site visits are free and there is no obligation.

Does a utility extension need planning permission?

Often not, if it is single storey and within permitted development limits. We check this for your property.

Can a utility have a toilet?

Yes, space permitting. A WC needs drainage and extraction, which we plan into the design.

Book a free site visit in Burntwood

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote