Wallsend timber frame extensions, designed and built
From the first sketch to final sign-off, we plan and build timber frame extensions in Wallsend and the surrounding Tyne and Wear area.
- Guide price in WallsendFrom £19,000 inc VAT
- PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
- Build time8–14 weeks on site
- Postcode districtsNE6, NE7, NE12, NE28, NE31

Guide prices for Wallsend
For Wallsend we adjust our national guide rates by ×0.91, the factor we use for North East England. Figures include VAT; your written quote after the survey replaces them.
Typical rates in Wallsend: £1,590 to £3,090 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 4 m 12 m² | £19,000 – £23,000 | £22,000 – £29,000 | £28,000 – £37,500 |
| 4 m × 5 m 20 m² | £31,500 – £38,500 | £37,000 – £48,500 | £47,000 – £62,000 |
| 5 m × 6 m 30 m² | £47,500 – £57,500 | £55,500 – £72,500 | £70,500 – £93,000 |
For a figure based on your own dimensions, use our guide-price tool.
Planning rules that apply in Wallsend
In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.
Before any drawing is finalised we check whether the house is listed, in a conservation area or subject to an Article 4 direction.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Applications are decided by the local planning authority (your district, borough or unitary council).
Included in a typical project
- Frame design and structural calculations
- Breathable wall build-up with insulation
- Fire and acoustic details where needed
- Foundations, often lighter than masonry
- Cladding, render or brick slip finish
Extensions in and around Wallsend
We cover Wallsend and the postcode districts NE6, NE7, NE12, NE28, NE31, NE32. The same team covers Hebburn (1 mile), Jarrow (2 miles), Felling (3 miles), Gosforth (3 miles), all within easy reach.
Cramlington, in Northumberland, is roughly 7 miles from Wallsend and also on our list. The North East has many brick terraces, colliery-era housing and post-war semis, with rear extensions and kitchen extensions the most common requests.
From first visit to completion
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
It starts with a visit to your house to measure, check access and talk through ideas and budget.
Design and approvals
Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.
Fixed written price
The price is fixed in writing once the design is settled, with a clear programme and payment stages.
Build and sign-off
The build is managed from start to finish, inspected at each stage and signed off on completion.
Common questions in Wallsend
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Wallsend, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
Will my neighbours in Wallsend be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Do you cover all of Wallsend?
Yes. We cover Wallsend and the surrounding parts of Tyne and Wear. Site visits are free and there is no obligation.
Does a timber frame extension need planning permission?
The same planning rules apply as for any extension. If the cladding looks different from the house, permitted development’s matching-materials condition may mean an application is needed.
Is timber frame cheaper than brick?
It is similar overall. The frame can save time on site, but the cladding choice has a big effect on cost. Our guide range is about £1,590 to £3,090 per m² including VAT.
Book a free site visit in Wallsend
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.