house-extension.uk

Timber frame extensions in Tonbridge

From the first sketch to final sign-off, we plan and build timber frame extensions in Tonbridge and the surrounding Kent area.

  • Guide price in TonbridgeFrom £23,500 inc VAT
  • PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
  • Build time8–14 weeks on site
  • Postcode districtsTN9, TN10, TN11
Timber frame extension under construction with OSB sheathing and roof joists

Guide prices for Tonbridge

Prices below are for Tonbridge, using the South East England factor of ×1.12. They are guide ranges including VAT for the build only, not a quote.

Typical rates in Tonbridge: £1,960 to £3,810 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
3 m × 4 m
12 m²
£23,500 – £28,500£27,500 – £36,000£34,500 – £46,000
4 m × 5 m
20 m²
£39,000 – £47,500£45,500 – £59,500£58,000 – £76,500
5 m × 6 m
30 m²
£58,500 – £71,000£68,500 – £89,500£87,000 – £114,500

For a figure based on your own dimensions, use our guide-price tool.

Working in Tonbridge

Our survey diary covers Tonbridge, including TN9, TN10, TN11. We also work in nearby Tunbridge Wells (4 miles), Sevenoaks (6 miles), Maidstone (12 miles), Swanley (15 miles).

Just over the East Sussex border, Crowborough is about 10 miles away. Homes across the South East range from Victorian terraces in the older town centres to large detached houses on the edges, so the right extension type varies street by street.

Planning and approvals in Tonbridge

In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.

The planning position for a specific Tonbridge address depends on its history and any designations, which is why we check it at the first visit.

Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.

Applications are decided by the local planning authority (your district, borough or unitary council).

Is a timber frame extension right for your house?

  • Sites where weight or speed matters
  • Homeowners who want strong energy performance
  • Contemporary designs with timber or board cladding

Our process, step by step

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    It starts with a visit to your house to measure, check access and talk through ideas and budget.

  2. Design and approvals

    We produce the drawings and structural design, and manage the approvals so they are in place before work starts.

  3. Fixed written price

    With the design and specification agreed, you get a fixed written price and a start date.

  4. Build and sign-off

    Work is carried out to the agreed programme, inspected by building control and signed off at the end.

Timber frame extension questions answered

Will my neighbours in Tonbridge be involved?

If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.

How long does a timber frame extension take to build in Tonbridge?

On site, typically 8 to 14 weeks once approvals are in place. Before that, allow 4–12 weeks design and approvals.

Do I need building regulations approval in Tonbridge?

Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.

Does a timber frame extension need planning permission?

The same planning rules apply as for any extension. If the cladding looks different from the house, permitted development’s matching-materials condition may mean an application is needed.

Is timber frame cheaper than brick?

It is similar overall. The frame can save time on site, but the cladding choice has a big effect on cost. Our guide range is about £1,960 to £3,810 per m² including VAT.

Book a free site visit in Tonbridge

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote