Redruth timber frame extensions, designed and built
Thinking about a timber frame extension for your Redruth home? Start with a free site visit: we measure up, check what the council will allow and give you honest guide figures on the day.
- Guide price in RedruthFrom £21,000 inc VAT
- PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
- Build time8–14 weeks on site
- Postcode districtsTR15, TR16

How much does a timber frame extension cost in Redruth?
Labour and material costs vary across the UK, so for Redruth we use our South West England factor (×1.02). The ranges include VAT and exclude design, structural and council fees.
Typical rates in Redruth: £1,780 to £3,470 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 4 m 12 m² | £21,000 – £26,000 | £25,000 – £32,500 | £31,500 – £42,000 |
| 4 m × 5 m 20 m² | £35,500 – £43,000 | £41,500 – £54,500 | £53,000 – £69,500 |
| 5 m × 6 m 30 m² | £53,500 – £64,500 | £62,500 – £81,500 | £79,500 – £104,500 |
Want a range for your exact size? The guide-price tool takes about a minute.
Planning and approvals in Redruth
In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.
In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Applications are decided by the local planning authority (your district, borough or unitary council).
Working in Redruth
Our survey diary covers Redruth, including TR15, TR16. Neighbouring towns we cover include Camborne (4 miles), Truro (8 miles), Falmouth (9 miles), Newquay (14 miles).
In the South West, local stone, render and brick vary from town to town, so matching materials is a big part of designing an extension that looks right.
What we take care of
- Cladding, render or brick slip finish
- Fire and acoustic details where needed
- Foundations, often lighter than masonry
- Breathable wall build-up with insulation
- Frame design and structural calculations
Moisture is the enemy of any timber building. We design ventilated cladding cavities, breather membranes and a proper damp-proof course height, and keep the frame dry during construction.
Our process, step by step
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.
Design and approvals
Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.
Fixed written price
You receive a written, itemised price and programme. Nothing starts until you are happy with it.
Build and sign-off
We build it with one project manager, book the building control inspections and hand over the completion certificate.
Questions people ask about timber frame extensions
Will my neighbours in Redruth be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Do I need building regulations approval in Redruth?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
How long does a timber frame extension take to build in Redruth?
On site, typically 8 to 14 weeks once approvals are in place. Before that, allow 4–12 weeks design and approvals.
Is timber frame cheaper than brick?
It is similar overall. The frame can save time on site, but the cladding choice has a big effect on cost. Our guide range is about £1,780 to £3,470 per m² including VAT.
Does a timber frame extension need planning permission?
The same planning rules apply as for any extension. If the cladding looks different from the house, permitted development’s matching-materials condition may mean an application is needed.
Book a free site visit in Redruth
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.