house-extension.uk

Timber frame extensions in Oban: design, approvals and build

Oban projects are quoted by arrangement: we plan the design, approvals and build carefully around travel and material deliveries, and confirm any travel costs up front.

  • Guide price in ObanFrom £20,500 inc VAT
  • PlanningScottish householder rules; building warrant needed
  • Build time8–14 weeks on site
  • Postcode districtsPA34
Timber frame extension under construction with OSB sheathing and roof joists

Extensions in and around Oban

Our survey diary covers Oban, including PA34. Island and remote projects are planned individually, with travel, deliveries and accommodation for the team agreed before the survey.

Across Scotland, extensions follow Scottish planning and building standards, including the building warrant process, which we build into the programme from the start.

Will the council need to approve it?

In Scotland, householder permitted development rules (Class 1A for single-storey ground-floor extensions and Class 1B for extensions of more than one storey) allow some smaller extensions without a planning application, within limits on depth, height and distance from the boundary. Conservation areas and listed buildings are more restricted.

The planning position for a specific Oban address depends on its history and any designations, which is why we check it at the first visit.

In Scotland a building warrant from the council is needed before work starts on almost any extension, and a completion certificate is issued when the work is accepted. Building standards are set in the Scottish technical handbooks.

Building close to a public sewer needs the agreement of Scottish Water, which we check during design.

Applications are decided by your council as planning authority.

Guide prices for Oban

Labour and material costs vary across the UK, so for Oban we use our Scotland factor (×0.98). The ranges include VAT and exclude design, structural and council fees.

Typical rates in Oban: £1,720 to £3,330 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
3 m × 4 m
12 m²
£20,500 – £25,000£24,000 – £31,500£30,500 – £40,000
4 m × 5 m
20 m²
£34,000 – £41,500£40,000 – £52,000£50,500 – £67,000
5 m × 6 m
30 m²
£51,000 – £62,000£60,000 – £78,000£76,000 – £100,000

Try the guide-price tool to see a range for your own size and finish.

When a timber frame extension makes sense

  • Contemporary designs with timber or board cladding
  • Homeowners who want strong energy performance
  • Sites where weight or speed matters

Our process, step by step

Visits to Oban are arranged around travel; we confirm any travel costs in writing before the survey.

  1. Site visit by arrangement

    A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.

  2. Design and approvals

    Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.

  3. Fixed written price

    We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.

  4. Build and sign-off

    Work is carried out to the agreed programme, inspected by building control and signed off at the end.

Questions people ask about timber frame extensions

Can I see a price before committing to anything?

Yes. The guide prices on this page are adjusted for Oban, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.

How long does a timber frame extension take to build in Oban?

On site, typically 8 to 14 weeks once approvals are in place. Before that, allow 4–12 weeks design and approvals.

Will my neighbours in Oban be involved?

If a planning application is needed, the council notifies neighbours. Where work is close to a shared boundary, we agree access and protection with them in writing.

Does a timber frame extension need planning permission?

The same planning rules apply as for any extension. If the cladding looks different from the house, permitted development’s matching-materials condition may mean an application is needed.

Is timber frame cheaper than brick?

It is similar overall. The frame can save time on site, but the cladding choice has a big effect on cost. Our guide range is about £1,720 to £3,330 per m² including VAT.

Talk to us about a project in Oban

We will talk through the project, the planning position and how we would organise the visit and the build.

  • Site visit arranged around travel, costs agreed first
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Send us your project details

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote