Timber frame extensions across Newtown
Newtown homeowners can use us for the whole timber frame extension project: survey, design, planning or permitted development checks, building regulations and the build itself.
- Guide price in NewtownFrom £19,500 inc VAT
- PlanningWelsh permitted development rules (rear up to 4 m)
- Build time8–14 weeks on site
- Postcode districtsSY16

Covering Newtown
Our survey diary covers Newtown, including SY16. Nearby, we also take on projects in Welshpool (11 miles), Llandrindod Wells (18 miles), Brecon (39 miles).
Just over the Dyfed border, Aberystwyth is about 33 miles away. Welsh housing ranges from stone terraces in the valleys to render-and-slate houses and modern estates, and the Welsh planning rules differ from England's in several places.
Guide prices for Newtown
For Newtown we adjust our national guide rates by ×0.93, the factor we use for Wales. Figures include VAT; your written quote after the survey replaces them.
Typical rates in Newtown: £1,630 to £3,160 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 4 m 12 m² | £19,500 – £23,500 | £22,500 – £30,000 | £29,000 – £38,000 |
| 4 m × 5 m 20 m² | £32,500 – £39,500 | £38,000 – £49,500 | £48,000 – £63,500 |
| 5 m × 6 m 30 m² | £48,500 – £59,000 | £57,000 – £74,000 | £72,500 – £95,000 |
For a figure based on your own dimensions, use our guide-price tool.
Who a timber frame extension suits
- Sites where weight or speed matters
- Homeowners who want strong energy performance
- Contemporary designs with timber or board cladding
Moisture is the enemy of any timber building. We design ventilated cladding cavities, breather membranes and a proper damp-proof course height, and keep the frame dry during construction.
Planning and approvals in Newtown
In Wales a single-storey rear extension can usually project up to 4 m beyond the rear wall without a planning application, if it is no more than 4 m high, keeps eaves to 3 m and overall height to 4 m within 2 m of a boundary, and covers no more than half the land around the original house. Wales has no larger home extension prior approval scheme.
Before any drawing is finalised we check whether the house is listed, in a conservation area or subject to an Article 4 direction.
The Party Wall etc. Act 1996 applies in Wales as in England: notice must be served before work to a shared wall, building on the boundary, or excavating close to a neighbour's foundations.
Building over or within 3 m of a public sewer needs the water company's consent before the foundations go in.
Applications are decided by the local planning authority (your county or county borough council, or the national park authority).
From first visit to completion
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
It starts with a visit to your house to measure, check access and talk through ideas and budget.
Design and approvals
We produce the drawings and structural design, and manage the approvals so they are in place before work starts.
Fixed written price
With the design and specification agreed, you get a fixed written price and a start date.
Build and sign-off
We build it with one project manager, book the building control inspections and hand over the completion certificate.
Common questions in Newtown
Who do I contract with for a timber frame extension in Newtown?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
Do you cover all of Newtown?
Yes. We cover Newtown and the surrounding parts of Powys. Site visits are free and there is no obligation.
Do I need building regulations approval in Newtown?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Does a timber frame extension need planning permission?
The same planning rules apply as for any extension. If the cladding looks different from the house, permitted development’s matching-materials condition may mean an application is needed.
Is timber frame cheaper than brick?
It is similar overall. The frame can save time on site, but the cladding choice has a big effect on cost. Our guide range is about £1,630 to £3,160 per m² including VAT.
Book a free site visit in Newtown
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.