Timber frame extensions in New Malden: design, approvals and build
A timber frame extension in New Malden starts with the right design and the right approval route. We take care of both, then build it with our own project management.
- Guide price in New MaldenFrom £27,000 inc VAT
- PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
- Build time8–14 weeks on site
- Postcode districtsKT1, KT2, KT3, KT4, KT5

Who a timber frame extension suits
- Contemporary designs with timber or board cladding
- Homeowners who want strong energy performance
- Sites where weight or speed matters
What should I budget for a timber frame extension in New Malden?
Labour and material costs vary across the UK, so for New Malden we use our London factor (×1.3). The ranges include VAT and exclude design, structural and council fees.
Typical rates in New Malden: £2,280 to £4,420 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 4 m 12 m² | £27,000 – £33,000 | £31,500 – £41,500 | £40,500 – £53,500 |
| 4 m × 5 m 20 m² | £45,500 – £55,000 | £53,000 – £69,000 | £67,500 – £88,500 |
| 5 m × 6 m 30 m² | £68,000 – £82,000 | £79,500 – £103,500 | £101,000 – £133,000 |
For a figure based on your own dimensions, use our guide-price tool.
Working in New Malden
Our survey diary covers New Malden, including KT1, KT2, KT3, KT4, KT5, SW20. Nearby, we also take on projects in Worcester Park (2 miles), Surbiton (2 miles), Morden (3 miles), Wimbledon (3 miles).
Across London, terraced houses with narrow side returns and tight access are the norm, which shapes everything from party wall notices to how materials reach the back garden.
Will the council need to approve it?
In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.
The planning position for a specific New Malden address depends on its history and any designations, which is why we check it at the first visit.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Applications are decided by the local planning authority (your district, borough or unitary council).
How the project works
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
We visit your New Malden home, measure up, talk through what you want and check the planning position.
Design and approvals
Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.
Fixed written price
The price is fixed in writing once the design is settled, with a clear programme and payment stages.
Build and sign-off
We build it with one project manager, book the building control inspections and hand over the completion certificate.
Questions people ask about timber frame extensions
How long does a timber frame extension take to build in New Malden?
On site, typically 8 to 14 weeks once approvals are in place. Before that, allow 4–12 weeks design and approvals.
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for New Malden, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
Do I need building regulations approval in New Malden?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Is timber frame cheaper than brick?
It is similar overall. The frame can save time on site, but the cladding choice has a big effect on cost. Our guide range is about £2,280 to £4,420 per m² including VAT.
Does a timber frame extension need planning permission?
The same planning rules apply as for any extension. If the cladding looks different from the house, permitted development’s matching-materials condition may mean an application is needed.
Book a free site visit in New Malden
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.