Timber frame extensions in Moray
A timber frame extension in Moray starts with the right design and the right approval route. We take care of both, then build it with our own project management.
- Guide priceFrom £20,500 inc VAT
- PlanningScottish householder rules; building warrant needed
- Towns covered4
- Site visitFree, no obligation

Towns in Moray
Included in a typical project
- Foundations, often lighter than masonry
- Breathable wall build-up with insulation
- Frame design and structural calculations
- Fire and acoustic details where needed
- Cladding, render or brick slip finish
Working in Moray
Towns we cover in Moray include Elgin, Forres, Buckie, Lossiemouth. Across Scotland, extensions follow Scottish planning and building standards, including the building warrant process, which we build into the programme from the start.
Timber frame extension prices in Moray
Labour and material costs vary across the UK, so for Moray we use our Scotland factor (×0.98). The ranges include VAT and exclude design, structural and council fees.
Typical rates in Moray: £1,720 to £3,330 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 4 m 12 m² | £20,500 – £25,000 | £24,000 – £31,500 | £30,500 – £40,000 |
| 4 m × 5 m 20 m² | £34,000 – £41,500 | £40,000 – £52,000 | £50,500 – £67,000 |
| 5 m × 6 m 30 m² | £51,000 – £62,000 | £60,000 – £78,000 | £76,000 – £100,000 |
Want a range for your exact size? The guide-price tool takes about a minute.
Planning and approvals in Moray
In Scotland, householder permitted development rules (Class 1A for single-storey ground-floor extensions and Class 1B for extensions of more than one storey) allow some smaller extensions without a planning application, within limits on depth, height and distance from the boundary. Conservation areas and listed buildings are more restricted. Separately, almost every extension needs a building warrant from the council before work starts.
In a conservation area or national scenic area the householder permitted development rights are more limited, listed homes need listed building consent, and if rights have been removed by a condition or direction, any extension needs an application.
Building close to a public sewer needs the agreement of Scottish Water, which we check during design.
Applications are decided by your council as planning authority.
What happens next
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
We visit your Moray home, measure up, talk through what you want and check the planning position.
Design and approvals
Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.
Fixed written price
You receive a written, itemised price and programme. Nothing starts until you are happy with it.
Build and sign-off
Work is carried out to the agreed programme, inspected by building control and signed off at the end.
Common questions in Moray
Do you cover all of Moray?
Yes, across the whole of Moray. Site visits are free and there is no obligation.
Who do I contract with for a timber frame extension in Moray?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
Do I need building regulations approval in Moray?
Yes. Almost every extension needs it, whatever the planning route. In Scotland that means a building warrant before work starts.
Is timber frame cheaper than brick?
It is similar overall. The frame can save time on site, but the cladding choice has a big effect on cost. Our guide range is about £1,720 to £3,330 per m² including VAT.
Does a timber frame extension need planning permission?
The same planning rules apply as for any extension. If the cladding looks different from the house, permitted development’s matching-materials condition may mean an application is needed.
Book a free site visit in Moray
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.