Timber frame extensions for homes in Ellon
Planning a timber frame extension in Ellon? We survey the house, work out the planning route, draw the design and build it, so you deal with one team from the first visit to the completion certificate.
- Guide price in EllonFrom £20,500 inc VAT
- PlanningScottish householder rules; building warrant needed
- Build time8–14 weeks on site
- Postcode districtsAB41

Extensions in and around Ellon
Across AB41, we can visit, measure and advise. We also work in nearby Inverurie (13 miles), Peterhead (15 miles), Aberdeen (16 miles), Westhill (17 miles).
Buckie, in Moray, is roughly 37 miles from Ellon and also on our list. Across Scotland, extensions follow Scottish planning and building standards, including the building warrant process, which we build into the programme from the start.
Will the council need to approve it?
In Scotland, householder permitted development rules (Class 1A for single-storey ground-floor extensions and Class 1B for extensions of more than one storey) allow some smaller extensions without a planning application, within limits on depth, height and distance from the boundary. Conservation areas and listed buildings are more restricted. Separately, almost every extension needs a building warrant from the council before work starts.
In a conservation area or national scenic area the householder permitted development rights are more limited, listed homes need listed building consent, and if rights have been removed by a condition or direction, any extension needs an application.
Building close to a public sewer needs the agreement of Scottish Water, which we check during design.
Applications are decided by your council as planning authority.
What we take care of
- Cladding, render or brick slip finish
- Foundations, often lighter than masonry
- Fire and acoustic details where needed
- Breathable wall build-up with insulation
- Frame design and structural calculations
How much does a timber frame extension cost in Ellon?
Labour and material costs vary across the UK, so for Ellon we use our Scotland factor (×0.98). The ranges include VAT and exclude design, structural and council fees.
Typical rates in Ellon: £1,720 to £3,330 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 4 m 12 m² | £20,500 – £25,000 | £24,000 – £31,500 | £30,500 – £40,000 |
| 4 m × 5 m 20 m² | £34,000 – £41,500 | £40,000 – £52,000 | £50,500 – £67,000 |
| 5 m × 6 m 30 m² | £51,000 – £62,000 | £60,000 – £78,000 | £76,000 – £100,000 |
Want a range for your exact size? The guide-price tool takes about a minute.
What happens next
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
It starts with a visit to your house to measure, check access and talk through ideas and budget.
Design and approvals
We draw the design, agree it with you and handle planning or permitted development checks and building regulations.
Fixed written price
The price is fixed in writing once the design is settled, with a clear programme and payment stages.
Build and sign-off
Work is carried out to the agreed programme, inspected by building control and signed off at the end.
Timber frame extension questions answered
Will my neighbours in Ellon be involved?
If a planning application is needed, the council notifies neighbours. Where work is close to a shared boundary, we agree access and protection with them in writing.
Do I need building regulations approval in Ellon?
Yes. Almost every extension needs it, whatever the planning route. In Scotland that means a building warrant before work starts.
Do you cover all of Ellon?
Yes. We cover Ellon and the surrounding parts of Aberdeen and Aberdeenshire. Site visits are free and there is no obligation.
Does a timber frame extension need planning permission?
The same planning rules apply as for any extension. If the cladding looks different from the house, permitted development’s matching-materials condition may mean an application is needed.
Is timber frame cheaper than brick?
It is similar overall. The frame can save time on site, but the cladding choice has a big effect on cost. Our guide range is about £1,720 to £3,330 per m² including VAT.
Book a free site visit in Ellon
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.