Timber frame extensions across Cowes
Planning a timber frame extension in Cowes? We survey the house, work out the planning route, draw the design and build it, so you deal with one team from the first visit to the completion certificate.
- Guide price in CowesFrom £23,500 inc VAT
- PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
- Build time8–14 weeks on site
- Postcode districtsPO31, PO32

Local to Cowes
We cover Cowes and the postcode districts PO31, PO32. Nearby, we also take on projects in Newport, Isle of Wight (4 miles), Ryde (6 miles), Sandown (10 miles).
The South East has a broad mix of 1930s semis, post-war estates, newer developments and period cottages, and many houses have enough garden for a generous rear extension.
Timber frame extension prices in Cowes
For Cowes we adjust our national guide rates by ×1.12, the factor we use for South East England. Figures include VAT; your written quote after the survey replaces them.
Typical rates in Cowes: £1,960 to £3,810 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 4 m 12 m² | £23,500 – £28,500 | £27,500 – £36,000 | £34,500 – £46,000 |
| 4 m × 5 m 20 m² | £39,000 – £47,500 | £45,500 – £59,500 | £58,000 – £76,500 |
| 5 m × 6 m 30 m² | £58,500 – £71,000 | £68,500 – £89,500 | £87,000 – £114,500 |
For a figure based on your own dimensions, use our guide-price tool.
When a timber frame extension makes sense
- Homeowners who want strong energy performance
- Contemporary designs with timber or board cladding
- Sites where weight or speed matters
Planning rules that apply in Cowes
In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.
In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Applications are decided by the local planning authority (your district, borough or unitary council).
What happens next
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
First, a site visit: we look at the house, garden, access and drains and listen to what you need.
Design and approvals
Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.
Fixed written price
With the design and specification agreed, you get a fixed written price and a start date.
Build and sign-off
We build it with one project manager, book the building control inspections and hand over the completion certificate.
Timber frame extension questions answered
Do you cover all of Cowes?
Yes. We cover Cowes and the surrounding parts of Isle of Wight. Site visits are free and there is no obligation.
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Cowes, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
How long does a timber frame extension take to build in Cowes?
On site, typically 8 to 14 weeks once approvals are in place. Before that, allow 4–12 weeks design and approvals.
Does a timber frame extension need planning permission?
The same planning rules apply as for any extension. If the cladding looks different from the house, permitted development’s matching-materials condition may mean an application is needed.
Is timber frame cheaper than brick?
It is similar overall. The frame can save time on site, but the cladding choice has a big effect on cost. Our guide range is about £1,960 to £3,810 per m² including VAT.
Book a free site visit in Cowes
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.