Timber frame extensions in Colwyn Bay
We design and build timber frame extensions for houses in Colwyn Bay, with a written price once the survey and design are done and one point of contact throughout.
- Guide price in Colwyn BayFrom £19,500 inc VAT
- PlanningWelsh permitted development rules (rear up to 4 m)
- Build time8–14 weeks on site
- Postcode districtsLL28, LL29

What should I budget for a timber frame extension in Colwyn Bay?
For Colwyn Bay we adjust our national guide rates by ×0.93, the factor we use for Wales. Figures include VAT; your written quote after the survey replaces them.
Typical rates in Colwyn Bay: £1,630 to £3,160 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 4 m 12 m² | £19,500 – £23,500 | £22,500 – £30,000 | £29,000 – £38,000 |
| 4 m × 5 m 20 m² | £32,500 – £39,500 | £38,000 – £49,500 | £48,000 – £63,500 |
| 5 m × 6 m 30 m² | £48,500 – £59,000 | £57,000 – £74,000 | £72,500 – £95,000 |
For a figure based on your own dimensions, use our guide-price tool.
What is included
- Breathable wall build-up with insulation
- Cladding, render or brick slip finish
- Foundations, often lighter than masonry
- Fire and acoustic details where needed
- Frame design and structural calculations
Moisture is the enemy of any timber building. We design ventilated cladding cavities, breather membranes and a proper damp-proof course height, and keep the frame dry during construction.
Will the council need to approve it?
In Wales a single-storey rear extension can usually project up to 4 m beyond the rear wall without a planning application, if it is no more than 4 m high, keeps eaves to 3 m and overall height to 4 m within 2 m of a boundary, and covers no more than half the land around the original house. Wales has no larger home extension prior approval scheme.
In a conservation area, national park, National Landscape or World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
Building over or within 3 m of a public sewer needs the water company's consent before the foundations go in.
The Party Wall etc. Act 1996 applies in Wales as in England: notice must be served before work to a shared wall, building on the boundary, or excavating close to a neighbour's foundations.
Applications are decided by the local planning authority (your county or county borough council, or the national park authority).
Working in Colwyn Bay
Across LL28, LL29, we can visit, measure and advise. We also work in nearby Llandudno (5 miles), Rhyl (10 miles), Prestatyn (13 miles), Flint (25 miles).
In Wales, terraced houses with rear offshoots are common in the towns, while detached houses and bungalows dominate in rural areas.
What happens next
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
We visit your Colwyn Bay home, measure up, talk through what you want and check the planning position.
Design and approvals
We produce the drawings and structural design, and manage the approvals so they are in place before work starts.
Fixed written price
We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.
Build and sign-off
Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.
Timber frame extension questions answered
How long does a timber frame extension take to build in Colwyn Bay?
On site, typically 8 to 14 weeks once approvals are in place. Before that, allow 4–12 weeks design and approvals.
Will my neighbours in Colwyn Bay be involved?
If a planning application is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Who do I contract with for a timber frame extension in Colwyn Bay?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
Does a timber frame extension need planning permission?
The same planning rules apply as for any extension. If the cladding looks different from the house, permitted development’s matching-materials condition may mean an application is needed.
Is timber frame cheaper than brick?
It is similar overall. The frame can save time on site, but the cladding choice has a big effect on cost. Our guide range is about £1,630 to £3,160 per m² including VAT.
Book a free site visit in Colwyn Bay
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.