Timber frame extensions in Bow
Bow homeowners can use us for the whole timber frame extension project: survey, design, planning or permitted development checks, building regulations and the build itself.
- Guide price in BowFrom £27,000 inc VAT
- PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
- Build time8–14 weeks on site
- Postcode districtsE1, E3, E9, E13, E14

Extensions in and around Bow
Across E1, E3, E9, E13, E14, E15, we can visit, measure and advise. We also work in nearby Stratford (1 mile), Stepney (1 mile), West Ham (2 miles), Canning Town (2 miles).
Just over the Essex border, Waltham Abbey is about 11 miles away. In London, space is at a premium and gardens are often short, so side returns, wraparounds and carefully planned rear extensions tend to make the most of every metre.
How much does a timber frame extension cost in Bow?
For Bow we adjust our national guide rates by ×1.3, the factor we use for London. Figures include VAT; your written quote after the survey replaces them.
Typical rates in Bow: £2,280 to £4,420 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 4 m 12 m² | £27,000 – £33,000 | £31,500 – £41,500 | £40,500 – £53,500 |
| 4 m × 5 m 20 m² | £45,500 – £55,000 | £53,000 – £69,000 | £67,500 – £88,500 |
| 5 m × 6 m 30 m² | £68,000 – £82,000 | £79,500 – £103,500 | £101,000 – £133,000 |
For a figure based on your own dimensions, use our guide-price tool.
Planning rules that apply in Bow
In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.
The planning position for a specific Bow address depends on its history and any designations, which is why we check it at the first visit.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Applications are decided by the local planning authority (your district, borough or unitary council).
What we take care of
- Fire and acoustic details where needed
- Frame design and structural calculations
- Breathable wall build-up with insulation
- Cladding, render or brick slip finish
- Foundations, often lighter than masonry
What happens next
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.
Design and approvals
Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.
Fixed written price
You receive a written, itemised price and programme. Nothing starts until you are happy with it.
Build and sign-off
We build it with one project manager, book the building control inspections and hand over the completion certificate.
Questions people ask about timber frame extensions
Do I need building regulations approval in Bow?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Will my neighbours in Bow be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Who do I contract with for a timber frame extension in Bow?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
Does a timber frame extension need planning permission?
The same planning rules apply as for any extension. If the cladding looks different from the house, permitted development’s matching-materials condition may mean an application is needed.
Is timber frame cheaper than brick?
It is similar overall. The frame can save time on site, but the cladding choice has a big effect on cost. Our guide range is about £2,280 to £4,420 per m² including VAT.
Book a free site visit in Bow
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.